
9
Venting the boiler
B
A
1.
Close the shut-off valves on the heat-
ing water side.
2.
Connect the drain hose at the boiler
fill & drain valve
B
(on the connec-
tion set, accessories or on-site).
3.
Open valves
A
and
B
and vent
using mains pressure until no more
air noise is audible.
4.
Close valves
A
and
B
and open
the heating water shut-off valves.
Venting the heating system
1.
Close the gas shut-off valve and
switch ON the control unit ON/OFF
switch.
2.
Activate the venting program via cod-
ing address "2F:1".
Note
To call up code 1 and for setting the
coding address, see page 38.
For function and sequence of the
venting program, see page 99.
Whilst the venting program runs, the
display shows "EL" (constant tem-
perature control unit) or "Entlüf-
tung" (Venting) (weather-compen-
sated control unit).
3.
Check the system pressure.
Commissioning, inspection, maintenance
Further details regarding the individual steps
(cont.)
5692 760 GB
Summary of Contents for VITOCONTROL-S, WB2B
Page 5: ...5 Keyword index 119 Index Index cont 5692 760 GB ...
Page 121: ...121 5692 760 GB ...
Page 122: ...122 5692 760 GB ...
Page 123: ...123 5692 760 GB ...