22
■ Route LV cables < 42 V separately
from cables > 42 V/230 V~/400 V~.
■ Strip the insulation from the cables as
close to the terminals as possible, and
bundle tightly to the corresponding ter-
minals.
■ Secure cables with cable ties.
■ If 2 components are connected to the
same terminal, press both cores
together in a
single
wire ferrule.
This ensures that, in the event of a fault
(e.g. when detaching a wire), the wires
cannot drift into the adjacent voltage
area.
Opening the wiring chamber
2.
1.
Installation sequence
Electrical connections, heat pump
(cont.)
5516 436 GB