background image

17

 

 

6020938-02 

10

 

MAINTENANCE AND PERIODIC CHECKS 

 

CAUTION: All the operations described in this chapter MUST BE CARRIED OUT BY QUALIFIED 

PERSONNEL ONLY. After servicing operations, re-install the cover panels, and fix them by means 

of screws. 

 

Be careful when working near the condensing coils.

 

The aluminium fins are very sharp and can cause serious injuries.

 

 

After the maintenance operations, close the panels by fixing them with screws.

 

It is a good rule to carry out periodic checks in order to verify the proper operation of the unit: 

OPERATION 

1 month 

months 

months 

Filling the water circuit. 

 

 

Presence of bubbles in the water circuit. 

 

 

Check the proper working of the safety and control devices. 

 

 

Check if there is a possible water leakage from the water circuit. 

 

 

Clean the metal filters of the water circuit. 

 

 

Tightening of plumbing connections. 

 

 

Check the operating pressure, superheating and sub-cooling. 

 

 

Check the expansion vessel (if installed) 

 

 

If the unit should be out of service for a long period, drain water from the pipes and water tank. This operation is 

necessary if, during seasonal stoppages, ambient temperature is expected to go down below the freezing point of 

the employed fluid. 

 

 

11

 

DECOMMISSIONING 

Once the unit has reached the end of its life cycle and needs to be replaced, the following operations are 

recommended: 

 

the refrigerant has to be recovered by trained personnel and sent to proper collection centres; 

 

the compressors’ lubricating oil has to be collected and sent to proper collection centres; 

 

the electronic components, such as regulators, driver boards and inverters, must be disassembled and 

sent to proper collection centres; 

 

the structure and the different components, if unusable, must be scrapped and divided according to their 

nature; there is especially a good amount of copper and aluminium in the machine. 

These operations allow easy material recovery and the recycling process, thus reducing the environmental 

impact. 

The user is responsible for the proper disposal of this product, according to national regulations in the 

country of destination of the appliance. For more information you should contact the Installation Company 

or local competent authority. 

 

An incorrect decommissioning of the appliance may create serious environmental damage and endanger people’s safety. 

Therefore, it is recommended that the unit be disposed only by authorised persons with technical training who have attended 

training courses acknowledged by the competent authorities. 

It is required to follow the same precautions described in the previous paragraphs. 

Pay special attention during disposal of the refrigerant gas. 

The illegal disposal of the product by the end user leads to the application of the penalties in 

accordance with the law in the country where the disposal takes place.

 

 

The crossed-out bin symbol applied on the appliance indicates that the product, at the end of its 

useful life, must be collected separately from other waste.

 

 

 

Summary of Contents for Vitocal 100-A Series

Page 1: ...6020938 02 7 2020...

Page 2: ...T 6 7 INSTALLATION 12 7 1 GENERAL 12 7 2 LIFTING AND HANDLING 12 7 3 POSITIONING AND MINIMUM TECHNICAL CLEARANCES 12 7 4 INSTALLATION 13 7 5 PLUMBING CONNECTIONS 14 7 5 1 Plumbing connections between...

Page 3: ...eference material We also decline any responsibility for possible inaccuracies in the manual if due to printing or transcription errors The customer shall store any updated copy of the manual or parts...

Page 4: ...he inertial tank is discharged and disconnected from the plant Maintenance personnel must receive suitable training for the performance of their tasks in safety Operators must know how to use personal...

Page 5: ...be easily installed inside the structure without the need for additional spaces and connections to add an electric heater for technical water heating In addition each model is supplied with a charge d...

Page 6: ...ield which identify the ACT series in any customisations the MC field consists of two digits 011960 VS RE KI 00 MC MAIN CODE SIZE FACTORY FITTED ACCESSORIES 011960 VS RE KI Tank volume Electric heater...

Page 7: ...ic kit consisting of an electric heater a probe thermowell and 2 electric panels containing terminals thermostats and a sensing bulb to insert into the thermowell of the probe All components should be...

Page 8: ...e beginning any type of operation make sure that power is disconnected Connect the conductors in order phase neutral and earth The supply voltage s fluctuations cannot exceed 10 of the nominal value I...

Page 9: ...ACT Technical water inertial storage tanks 8 6020938 02 endanger the proper operation of the unit...

Page 10: ...fied by Approvato Approved by Titol o Title Schema elettrico ACT 1ph R 2 3 4 5 kW Codice Code Oggetto Object Schema elettrico Electrical drawing Foglio S heet 1 di of 1 Tuttele informazioni contenuten...

Page 11: ...19 00 First emiss ion 05 06 2017 A B A B A B Rev Item Descrizione modifiche Description of changes Data Date Disegnato Drowing by Verificato Verified by Approvato Approved by Titol o Title Schema elet...

Page 12: ...ev Item Descrizione modifiche Description of changes Data Date Disegnato Drowing by Verificato Verified by Approvato Approved by Titolo Title Schema elettrico ACT R 1 2 kW Codice Code Ogg ett o Objec...

Page 13: ...prevent the risk of fire at the installation place The outside temperature must never exceed 46 C Beyond this value the unit is no longer covered by the current regulations in the field of safety of...

Page 14: ...e omega support using the fixing screws and washers supplied in the threaded inserts already prepared Place between the Vitocal 100 A unit and the anti vibration dampers supplied and before the start...

Page 15: ...ater circuit All pipes must be insulated with closed cell material of adequate thickness The water circuit should include the following components Well thermometers to monitor the circuit s temperatur...

Page 16: ...etely discharged use the provided service valve It is advisable to install a suitable discharge pipe in order to preserve the surrounding area and to drain the technical fluid following standards in f...

Page 17: ...te gaskets Check that all panels are positioned correctly and well fixed with screws CAUTION IT IS REQUIRED TO REDUCE THE PRESSURE OF THE EXPANSION VESSEL OF THE Vitocal 100 A UNIT TO 1 5 BAR 9 SHUTDO...

Page 18: ...rained personnel and sent to proper collection centres the compressors lubricating oil has to be collected and sent to proper collection centres the electronic components such as regulators driver boa...

Page 19: ...xpansion Vessel Kit for all sizes Capacity litres 18 Operating pressure bar 1 3 Max pressure bar 3 0 Operating weight kg 15 TECHNICAL SPECIFICATIONS Unit of Electrical Heater Kit for all sizes Power k...

Page 20: ...ociated unit s code which you can read on the technical label applied on the unit itself Heater Model Maximum input power Maximum input current Fuses Power supply 2 kW SINGLE PHASE 2 kW 8 70 A 10 A 23...

Page 21: ...rint with Vitocal 100 A ranges VARIATION OF THE HEIGHT A DEPENDING ON THE ADJUSTMENT OF SUPPORTING FEET MODEL Vitocal 100 A MINIMUM MAXIMUM AWO M AC 101 A06 AWO M AC 101 A08 1270 mm 1293 mm AWO M AC 1...

Page 22: ...igurations there is a handbook which is a technical notebook including a series of system diagrams that have been highlighted regarding the installation configuration of our high efficiency heat pumps...

Page 23: ...r inertial storage tanks 22 6020938 02 6020938 02 Confidential technical information Viessmann Limited Hortonwood 30 Telfort Shropshire TF1 7YP GB Telephone 44 1951675000 Fax 44 1952 675040 E mail inf...

Reviews: