54
Commissioning steps
Inspection steps
Maintenance steps
Page
•
•
•
1. Opening the heat pump
..................................................................................................... 55
•
2. Writing reports
.................................................................................................................... 55
•
•
•
3. Checking the refrigerant circuit for leaks
........................................................................ 55
•
4. Charging and venting on the primary side
...................................................................... 55
•
5. Filling and venting on the secondary side
....................................................................... 56
•
6. Charging and venting the solar circuit
............................................................................. 56
•
•
•
7. Checking expansion vessels and the primary circuit/heating circuit pressure
........... 57
•
8. Commissioning the system
............................................................................................... 57
•
•
•
9. Check electronic flow switch, type IFM
............................................................................ 64
•
10. Checking the electronic frost stat, type AC1-2W
............................................................ 65
•
•
•
11. Closing the heat pump
•
12. Instructing the system user
.............................................................................................. 66
Commissioning, inspection, maintenance
Steps - commissioning, inspection and maintenance
5549 984 GB
Summary of Contents for KWT BW 301.B090
Page 99: ...99 5549 984 GB...