71
2.
Press
SET
. Commissioning mode 1 is activated.
Under
ITEM
, a dot will flash while commissioning
mode 1 is active.
11
.
01
ITEM
STATE
It will not be possible to carry out commissioning
mode if "n1", "n2" or "n3" is flashing under
STATE
.
For the meaning of fault messages and to correct
faults, see page 70.
3.
Fill with the distilled water supplied.
While indicators "01" to "04" are flashing, continue
to fill with distilled water until they switch to con-
stant. The switch from flashing to constant display
will be repeated several times.
The whole process takes about 40 min.
Phase
Duration
min. approx.
01
4
02
15
03
20
04
0.5
When phase 04 shows constant, add another 0.5 l
of distilled water so that the integral trap is filled.
!
Please note
Escaping flue gas can damage your health.
Ensure that the integral trap is filled with
water.
Note
A fault has occurred during the commissioning
process if the display shows alternately "End" and
"nP".
Turn the ON/OFF switch on the fuel cell module
OFF and then ON again. Then restart commission-
ing mode 1.
4.
When "05" is displayed under
STATE
, the filling
process has finished and the start phase will com-
mence.
The starting procedure then continues automati-
cally:
Phase
Duration
min. ap-
prox.
Function
05
15
Venting
06 to 09
60
Process start
10
< 0.5
Process start com-
pleted
11
< 0.5
Preparation for pow-
er generation
12
–
Power generation
(indicators
GEN
and
GRD
illuminate)
5.
Remove the funnel from the filler neck and secure
it to the front panel with the screw (see page 69).
6.
Replace the cover on the distilled water filler neck
and secure it with the screw (see page 69).
Filling with distilled water (commissioning mode 3)
1.
Select
"13"
using / .
Commissioning, inspection, maintenance
Commissioning the fuel cell module
(cont.)
5775 636 GB
Summary of Contents for C3TB
Page 136: ...136 Troubleshooting Repairs gas condensing module cont 5775 636 GB Diagnosis ...
Page 143: ...143 Parts lists Heat cell assembly 5775 636 GB Components ...
Page 160: ...160 Parts not shown 0009 PCB IU100 B30 Parts lists Fuel cell assembly 5775 636 GB Components ...
Page 161: ...161 Parts lists Fuel cell assembly cont 5775 636 GB Components ...
Page 187: ...187 5775 636 GB ...