30
2.
Check the gas connections for tightness. Also
check the line to the fuel cell module. See page 23.
Note
Use only suitable and approved leak detection
agents (EN 14291) and devices for the tightness
test. Leak detection agents with unsuitable constit-
uents (e.g. nitrides, sulphides) can cause material
damage.
Remove leak detection agent residues after test-
ing.
!
Please note
Excessive test pressure can damage the
appliance.
Max. test pressure 150 mbar (15 kPa).
Where higher pressure is required for tight-
ness tests, disconnect the appliances from
the gas supply pipe (undo the fitting).
3.
Vent the gas line.
Opening the control unit enclosure on the gas condensing module
2x
4x
4.
3.
5.
2.
1.
Fig. 27
Installation sequence
Installing the Vitovalor 300-P
(cont.)
5775 636 GB
Installation
Summary of Contents for C3TB
Page 136: ...136 Troubleshooting Repairs gas condensing module cont 5775 636 GB Diagnosis ...
Page 143: ...143 Parts lists Heat cell assembly 5775 636 GB Components ...
Page 160: ...160 Parts not shown 0009 PCB IU100 B30 Parts lists Fuel cell assembly 5775 636 GB Components ...
Page 161: ...161 Parts lists Fuel cell assembly cont 5775 636 GB Components ...
Page 187: ...187 5775 636 GB ...