Opening the heat pump
Danger
Contact with 'live' components
can lead to severe injury from
electric current.
Never touch
terminal areas
(heat pump control unit and
power connections; see
page 34).
Danger
The absence of component
earthing can lead to serious injury
from electrical current and to
component damage if an electri-
cal fault occurs.
Always
reconnect the earth con-
ductors.
!
Please note
Wait
at least 30 min
between the
installation and commissioning of
the appliance to prevent equip-
ment damage.
Work on the refrigerant circuit
must
only
be carried out by quali-
fied personnel (in accordance
with Ordinances EC 842/2006
and 303/2008).
1.
Remove front panel, see page 18.
2.
When work is complete, close the
heat pump; see page 50.
Regarding commissioning this
appliance, see also the operating
instructions.
Writing reports
When commissioning the appliance as
described below, enter the actual values
captured into the reports from
page 106 and into the operator's log (if
available).
Commissioning, inspection, maintenance
Further details regarding the individual steps
5601 574 GB
Summary of Contents for BWT 221.A06
Page 20: ...20 aCH 10 9 Installation sequence Siting the heat pump cont 5601 574 GB ...
Page 22: ...22 4x 18 21 4x 6x 20 2x 19 Installation sequence Siting the heat pump cont 5601 574 GB ...
Page 23: ...23 25 2x 24 4x 22 23 Installation sequence Siting the heat pump cont 5601 574 GB Installation ...
Page 28: ...28 4 1 3 2 Installation sequence Siting the heat pump cont 5601 574 GB ...
Page 71: ...71 Opening programming unit 2 2x 1 3 Troubleshooting Repairs cont 5601 574 GB Service ...
Page 122: ...122 5601 574 GB ...
Page 123: ...123 5601 574 GB ...