Commissioning steps
Inspection steps
Maintenance steps
Page
•
•
•
1. Opening the heat pump
..................................................................................................... 44
•
2. Compiling reports
.............................................................................................................. 44
•
•
•
3. Checking the refrigerant circuit for leaks
........................................................................ 44
•
4. Filling and venting on the primary side
........................................................................... 44
•
5. Filling and venting on the secondary side
....................................................................... 45
•
•
•
6. Checking expansion vessels and primary circuit/secondary circuit pressure
............ 45
•
7. Commissioning the system
............................................................................................... 45
•
•
•
8. Checking the electronic flow switch, type IFM
................................................................ 46
•
•
•
9. Fitting the top panel and front panel (closing the heat pump)
...................................... 47
•
10. Instructing the system user
.............................................................................................. 47
Commissioning, inspection, maintenance
Steps - commissioning, inspection and maintenance