15
Types BW 302.DS140, BW 302.DS180 and BW 302.DS230
2040
852
800
1000
50
709
50
194
145,5
Fig. 9
ê
Pressure point, foot
E
Pressure-tested sound insulation layer, approx. 10
to 20 mm
F
Front of the heat pump
Transport and siting requirements: Hydraulic module defrost box
■
The hydraulic module defrost box is delivered ready
to connect.
■
On site drain connector/s must be fitted after posi-
tioning drip trays.
The drain connector is located in the control cabinet.
Unloading and handling
Note
Before unloading, have the recipient check the con-
signment for damage. Note down any damage on the
delivery note and notify the haulage contractor.
■
Lifting gear, such as slings and cross beams, must
be provided on site.
■
The lifting capacity of each sling and that of the cross
beam must be at least equal to the shipping weight.
See "Specification".
■
Only use suitable equipment for unloading the lorry;
see the following chapter.
!
Please note
Incorrect unloading and transporting can result
in damage to the appliance.
■
Never
put weight on top of the appliance.
■
Protect the paint:
Wrap the lifting gear (such as ropes, cross
beams) and place padding between the appli-
ance and lifting gear.
■
Observe correct weight distribution when lift-
ing.
■
To protect the hydraulic module defrost box
pipework:
Avoid bumps and shocks.
■
Avoid major slopes. Hydraulic module tilting
angle
max.
10°.
Note
Viessmann (Switzerland) AG accepts no liability for
any damage resulting from incorrect handling.
Preparing for installation
Transport and siting requirements: Heat pump
(cont.)
5837251
Installation