VIERLING VIT-A1 Operating Instructions Manual Download Page 1

VIT-A1 

 

DSL-Tester / Testeur DSL / Comprobador de líneas DSL 

Bedienungsanleitung 
Operating Instructions 
Mode d’emploi 
Manual de instrucciones

 

 

Ausgabe / Issue / Èdition / Edición 1.3 

VIERLING Communications GmbH  

70299.202  - 1.3 – 20050513 

Summary of Contents for VIT-A1

Page 1: ... Tester Testeur DSL Comprobador de líneas DSL Bedienungsanleitung Operating Instructions Mode d emploi Manual de instrucciones Ausgabe Issue Èdition Edición 1 3 VIERLING Communications GmbH 70299 202 1 3 20050513 ...

Page 2: ...ERLING Communications GmbH untersagt Änderungen ohne vorherige Ankündigung behalten wir uns vor Der vorliegende Text wurde mit größter Sorgfalt erarbeitet Sollte er dennoch Fehler enthalten kann die VIERLING Communications GmbH dafür keine Haftung übernehmen All rights reserved Any dissemination reproduction or processing of this document or its contents or excerpts from it regardless of the proce...

Page 3: ...reurs VIERLING Communications GmbH ne pourrait en être tenu responsable Reservados todos los derechos La divulgación y reproducción de este documento así como el uso y difusión indebidos de su contenido no están autorizados excepto bajo la obtención previa y expresa del consentimiento de la empresa VIERLING Communications GmbH Se reserva el derecho de introducir modificaciones sin previo aviso Est...

Page 4: ......

Page 5: ...und Bedienelemente 12 3 1 Buchse DC 12V 12 3 2 Schalter On ADSL Test Off Line Test 13 3 3 Buchse ADSL 14 3 4 Buchse LAN 14 4 Bedeutung der Anzeigen LED s 16 4 1 LED Power 16 4 2 LED Low Battery 17 4 3 LED Charge 17 4 4 LED Line Test 17 4 5 LED ADSL Test 18 5 Technische Daten 20 6 Konformitätserklärung 21 1 Safety Information 22 2 General Information about VIT A1 DSL Tester 24 2 1 Included in deliv...

Page 6: ...ED Charge 31 4 4 LED Line Test 31 4 5 LED ADSL Test 32 5 Technical Data 34 6 Declaration of Conformity 35 1 Informations concernant la sécurité 36 2 Informations générales sur le testeur VIT A1 38 2 1 Accessoires fournis 38 3 Description des connecteurs et de l interrupteur 40 3 1 Connecteur DC 12 V 40 3 2 Interrupteur On ADSL Test Off Line Test 41 3 3 Connecteur ADSL 42 3 4 Connecteur LAN 42 4 De...

Page 7: ... el comprobador de líneas DSL VIT A1 51 2 1 Alcance de suministro 51 3 Conexiones y elementos de mando 53 3 1 Terminal DC 12V 53 3 2 Selector On ADSL Test Off Line Test 54 3 3 Terminal ADSL 55 3 4 Terminal LAN 55 4 Significado de los LED de señalización 57 4 1 LED Power 57 4 2 LED Low Battery 58 4 3 LED Charge 58 4 4 LED Line Test 58 4 5 LED ADSL Test 59 5 Datos técnicos 61 6 Declaración de confor...

Page 8: ...gebracht kann Betauung auftreten Vor Inbetriebnahme muss das Gerät absolut trocken sein Deshalb ist eine Akklimatisationszeit von mindestens 2 Stunden abzuwarten Aufstellen Das hier beschriebene Gerät sollte nur von einer Elektrofachkraft bedient werden Das Gerät ist vor direktem Sonnenlicht und Hitze zu schützen Das Gerät darf nur mit einem geeigneten Netzadapter 12V 1A Gleichstrom Minuspol außen...

Page 9: ...en Sie dass beim erstmaligen Benutzen die Akkus vor Inbetriebnahme im ADSL Tester VIT A1 geladen werden müssen Reparaturen Reparaturen dürfen nur von dafür qualifiziertem Personal ausgeführt werden Es dürfen nur solche Ersatzteile verwendet werden die die Sicherheitsbestimmungen des Gerätes nicht verändern Wartungsarbeiten und Reparaturen am geöffneten Gerät dürfen nur von einer Fachkraft ausgefüh...

Page 10: ...ung analog oder UK0 auf der Leitung detektiert um die korrekte Anschaltung der a b Adern sicherzustellen andererseits wird geprüft ob eine Synchronisation mit dem DSL Access Multiplexer DSLAM in der Vermittlungsstelle möglich ist Über die im Gerät integrierte Ethernet Schnittstelle ist es zusätzlich möglich mit Hilfe eines angeschlossenen Notebooks diverse ADSL Verbindungsparameter für weitergehen...

Page 11: ...VIERLING VIT A1 70299 202 1 3 20050513 11 Abb Steckernetzteil Messschnur RJ45 Bananenstecker Messschnur RJ11 3 4 RJ45 4 5 Abb Transporttasche 12 V Kfz Adapter Abb Kfz Adapter ...

Page 12: ...schont werden Gerät im eingeschalteten Zustand Um einen ständigen Neustart der Akkuschnellladung bei Netzbetrieb des Geräts und Betätigen des Schalters zu vermeiden startet der Akkuladevorgang nur dann wenn sich der Schalter bereits für mindestens 10 Sekunden in der Position Off Line Test befindet und anschließend der Stecker des Stromversorgungskabels mit der DC Buchse verbunden wird In diesem Fa...

Page 13: ...en der Prüfung eines erfolgreichen ADSL Verbindungsaufbaus Schalterstellung ADSL Test und dem Test auf eine vorhandene Fernspeisespannung Schalterstellung Line Test umgeschaltet Schalterposition Off Line Test In der Schalterstellung Line Test wird detektiert ob auf der untersuchten Anschlussleitung die Fernspeisespannung für einen Analog oder ISDN Anschluss vorhanden ist wobei das Ergebnis durch d...

Page 14: ...ADSL Chipsatz eingesetzt wird entspricht dies der kompletten Initialisierung eines herkömmlichen Kundenmodems Der aktuelle Verbindungsstatus kann über die zugehörige LED ADSL Test auf der Gehäuseoberseite abgelesen werden 3 3 Buchse ADSL Über die RJ11 Buchse ADSL erfolgt der Anschluss des DSL Testers VIT A1 mit Hilfe eines entsprechenden Kabels an den gewünschten Messpunkt der Anschlussleitung z B...

Page 15: ...ungsdämpfung die SNR Reserve und die vereinbarten ATM Datenraten für Up und Downstream Eine genauere Beschreibung befindet sich in der Dokumentation der zugehörigen Software die zum Auslesen der Parameter erforderlich ist Desweiteren ist über die Buchse LAN nach Anschluss eines PC eine Verbindung ins Internet herstellbar so wie bei einem normalen Kundenmodem ...

Page 16: ...ite leuchtet die LED im Modus On ADSL Test bzw leuchtet nicht im Modus Off Line Test Weiterhin erlischt die LED auch in der Schalterposition On ADSL Test falls eine automatische Abschaltung des Geräts aufgrund leerer Akkus erfolgt oder eine zuvor aktive externe Stromversorgung ausgeschaltet bzw abgezogen wird Um nach einem solchen Fall das Gerät wieder einzuschalten muss der Kippschalter zunächst ...

Page 17: ...ich Das Gerät schaltet dabei automatisch und ohne Unterbrechung der laufenden Messung von Akku auf Netzbetrieb um sobald eine externe Stromquelle an die DC Buchse angeschlossen wird 4 3 LED Charge Die gelbe LED Charge leuchtet auf solange eine Schnellladung der Akkus im Gerät erfolgt Voraussetzung hierfür ist dass sich der Kippschalter auf der Gehäusefrontseite in der Position Off Line Test befind...

Page 18: ...en wurde oder dass ein Fehler in der Anschaltung der a b Adern vorliegt Die LED ist ebenfalls inaktiv wenn sich der Schalter in der Stellung ADSL Test befinden sollte LED Line Test leuchtet Es existiert eine Speisespannung auf der Leitung Dies besagt dass am entsprechenden Anschluss entweder das POTS Netz oder ISDN Netz geschaltet ist und somit die Adern a und b korrekt durchverbunden sind 4 5 LED...

Page 19: ...uf die Aktivierung geantwortet hat findet eine Handshake Prozedur nach ITU G 994 1 erste Phase des ADSL Verbindungsaufbaus statt LED ADSL Test blinkt schnell Die ADSL Initialisierung mit dem DSLAM läuft d h es findet die Synchronisations und Trainingsphase nach ITU G 992 1 zweite Phase des ADSL Verbindungsaufbaus statt LED ADSL Test leuchtet dauerhaft Die Synchronisation mit dem DSLAM wurde erfolg...

Page 20: ...ieferte Adapterkabel Ethernet Schnittstelle RJ45 Buchse zum optionalen Auslesen von ADSL Verbindungsparametern über ein PC oder Notebook Stromversorgung 4 NiMH Akkus Größe AA Mignon LR6 oder über externes Netzgerät Betriebszeit bei voll aufgeladenen Akkus ca 2 5 Stunden Ladezeit bei leeren Akkus ca 3 Stunden Lademöglichkeit über 12 V KFZ Adapter oder externes Netzgerät 12V 1A Minuspol außen Stroma...

Page 21: ...VIERLING VIT A1 70299 202 1 3 20050513 21 6 Konformitätserklärung ...

Page 22: ...ler environment into the operating location dewfall may occur The device must be absolutely dry before beginning operations Therefore an acclimatization period of at least two hours is required Setting Up The device described herein should only be operated by personnel who are professionally trained in electro technology The device should be protected from direct sunlight and heat The device may o...

Page 23: ...ng electrical storms NOTE The four enclosed batteries aren t charged Please note that the batteries must be charged before using for the first time in the ADSL tester VIT A1 Repairs Device repairs may only be carried out by qualified personnel Only those replacement parts may be used that do not alter device safety conditions Maintenance work on and repairs to an open device may only be undertaken...

Page 24: ...b wires the device can detect the presence of supply voltage on the line either analog or UK0 Moreover testing can also be done to determine whether synchronization is possible with the DSL Access Multiplexer DSLAM in the exchange With the help of a connected laptop it is also possible to read out various ADSL connecting parameters that can then be analyzed Additionally if a PC is connected to the...

Page 25: ... VIT A1 70299 202 1 3 20050513 25 Illustration External Power supply Measurement cable RJ45 pin plug Measurement cable RJ11 3 4 RJ45 4 5 Illustration Bag 12 V automobile adapter Illustration Automobile adapter ...

Page 26: ...reby the batteries are then preserved in this mode with maintenance charging In order to avoid having to use the switch and continually restarting the battery quick charge feature of the device when it is plugged into the mains electrical supply the battery charger only activates if the switch is in the Off Line Test position for at least 10 seconds followed by plugging the electrical supply cable...

Page 27: ...ition ADSL Test and testing for the presence of a remote current supply switch position Line Test Switch Position Off Line Test The Line Test switch position detects on the customer terminal connection line being tested whether remote current supply is available for an analog or ISDN connection Test results are indicated by the corresponding Line Test LED indicator located on top of the housing If...

Page 28: ...nding ADSL Test LED indicator located on top of the housing 3 3 ADSL Socket The connection of the VIT A1 DSL Tester is made over the ADSL RJ11 socket with the help of an appropriate cable at the desired measuring point of the customer terminal connection line for example the main distribution frame or cable branch box in the exchange direction A cable is supplied with the device for this purpose I...

Page 29: ...wnstream A more detailed description is available in the documentation of the corresponding software that is necessary for reading out parameters Furthermore after connecting a PC an internet connection can be set up over the LAN socket in the same manner as with a normal customer modem ...

Page 30: ... indicator is lighted in the On ADSL Test mode or on the other hand it is not lighted in the Off Line Test mode Furthermore the LED indicator extinguishes in the On ADSL Test switch position should the device automatically switch off due to depleted batteries or due to turning of or unplugging an existing external power supply In order to turn the device on again after such an event the flip switc...

Page 31: ...cket the device will automatically switch from battery to mains operation without interrupting measurements that are in progress 4 3 LED Charge While device batteries are being quick charged the yellow LED indicator will be lighted The requirements for this procedure are that the flip switch on the front side of the housing is in the Off Line Test position and thereafter an external power source a...

Page 32: ...switched and that a and b wires are properly through connected 4 5 LED ADSL Test If the flip switch is positioned at ADSL Test then the green ADSL Test LED indicator shows the status of the real ADSL connection set up with the DSL Access Multiplexer in the exchange The following indications are possible for the ADSL Test LED LED ADSL Test is not lighted The VIT A1 DSL Tester is turned off or else ...

Page 33: ...accord with ITU G 992 1 second phase of the ADSL connection set up LED ADSL Test remains lighted Synchronization with DSLAM has been successfully concluded This means that the ADSL connection and the ATM layer have been established If this status is maintained i e an immediate re synchronization or blinking of the LED does not take place then the ADSL Test has been successfully completed ...

Page 34: ...duct package Ethernet Interface RJ45 socket for optimal read out of ADSL connection parameters over PC or laptop Power Supply 4 NiMH Batteries Size AA Mignon LR6 or over external mains adapter Operating Time Approximately 2 5 hours with fully charged batteries Charging Time About 3 hours for empty batteries Charging Options Over 12 V auto adapter or external mains adapter 12 V 1 A External minus p...

Page 35: ...VIERLING VIT A1 70299 202 1 3 20050513 35 6 Declaration of Conformity ...

Page 36: ...ndensation peut se produire L appareil doit être sec avant la mise en service Pour cela il faut respecter un temps d acclimatation d au moins 2 heures Mise en œuvre L appareil présenté doit être uniquement utilisé par un personnel qualifié L appareil doit être protégé de la lumière directe du soleil et de la chaleur L appareil ne doit être utilisé ou chargé qu avec un adaptateur électrique adapté ...

Page 37: ...oterez donc que vous devez les charger avant d utiliser le testeur VIT A1 pour la première fois Réparations Les réparations ne peuvent être effectuées que par un personnel qualifié Seules les parties ne mettant pas en cause la sécurité peuvent être remplacées Les travaux de réparations ou de maintenance sur un appareil ouvert ne peuvent être entrepris que par un personnel qualifié ...

Page 38: ...ation ligne analogique ou RNIS et le bon câblage correct de l installation fils a et b et d autre part vérifier la synchronisation avec le modem du DSLAM En connectant un PC portable il est également possible de lire les paramètres de la connexion ADSL pour les analyser De plus si un PC est connecté sur l interface Ethernet une connexion Internet peut être établie de la même façon qu avec un modem...

Page 39: ... 70299 202 1 3 20050513 39 Illustration Alimentation chargeur externe câble RJ45 fiches bananes câble RJ11 3 4 RJ45 4 5 Illustration Sac de transport adaptateur allume cigare 12 V Illustration adaptateur allume cigare ...

Page 40: ...r l alimentation extérieure position On ce qui préserve les batteries Dans le but d éviter le rechargement des batteries lors des tests passage On Off le rechargement des batteries ne se fera que lors du raccordement du câble de l alimentation et si l interrupteur était sur la position Off depuis au moins 10 secondes Dans ce cas la LED jaune Charge sur la face supérieure de l appareil s allumera L...

Page 41: ...t ou le test de l alimentation de la ligne interrupteur en position Line Test Interrupteur en position Off Line Test En position Line Test la télé alimentation de la ligne est vérifiée pour une ligne analogique ou RNIS Le résultat du test est indiqué par la LED correspondante située sur la face supérieure de l appareil Si le test est positif cela confirme que les fils a et b sont bien connectés Ce...

Page 42: ... Un câble est fourni avec l appareil à cet effet Il mesure environ 2 mètres de long connecteur RJ11 fiches bananes sur la RJ11 les 2 contacts du milieu sont utilisés broches 3 et 4 Un câble RJ11 RJ45 est également fourni 3 4 Connecteur LAN L utilisateur peut également connecter un PC portable ou non sur la prise RJ45 LAN avec une carte réseau Ethernet 100BaseT Pour cette connexion il faut utiliser...

Page 43: ...teint avec l interrupteur en position On ADSL Test cela signifie que les batteries viennent de se vider ou que la prise de l alimentation extérieure est débranchée Pour remettre l appareil sous tension après un tel événement il faut d abord remettre l interrupteur en position Off Line Test et ensuite le remettre en position On ADSL Test Si l appareil est utilisé sans alimentation extérieure l inte...

Page 44: ...esures en cours 4 3 LED Charge Lorsque les batteries sont en charge rapide la LED jaune est allumée Pour rentrer dans cette phase il faut que l interrupteur sur le côté de l appareil soit en position Off Line Test et qu ensuite une alimentation externe soit raccordée sur la prise DC prise allume cigare ou chargeur Dès que le processus de charge des batteries est terminé ce qui demande environ 3 he...

Page 45: ...e la connexion face au DSLAM Les indications suivantes de la LED ADSL Test sont possibles La LED ADSL Test est éteinte Le testeur VIT A1 est éteint ou les autotests qui se produisent après la mise sous tension sont encore en cours et empêchent le mode ADSL Test La LED ADSL Test clignote lentement L appareil essaye constamment de se connecter au modem du DSLAM Dès que celui ci aura répondu la phase...

Page 46: ...nisation avec le DSLAM s est effectuée correctement Cela signifie que la connexion ADSL et les couches ATM ont été établies Si cet état est maintenu c est à dire qu il n y a pas de re synchronisation immédiate caractérisée par le clignotement de la LED le test ADSL est déclaré correct ...

Page 47: ...5 fournis avec l appareil Interface Ethernet Prise RJ45 pour lecture optionnelle sur PC portable des résultats de mesures de la connexion ADSL Alimentation électrique 4 batteries NiMH taille AA ou LR6 ou par l alimentation externe chargeur Durée d utilisation Environ 2 5 heures avec les batteries chargées Durée de charge Environ 3 heures batteries vides Option d alimentation A travers une prise al...

Page 48: ...VIERLING 48 70299 202 1 3 20050513 VIT A1 6 Déclaration de conformité ...

Page 49: ... lugar de uso Por lo tanto deposite el comprobador en el lugar de uso para al menos 2 horas antes de ponerlo en funcionamiento para asegurar que se seque por completo y compensar la diferencia de temperatura Montaje El comprobador descrito en este manual únicamente debe ser manejado por personal electricista No exponer el comprobador directamente a la luz solar y fuentes de calor Únicamente se deb...

Page 50: ... cargar colocados en el comprobador de líneas ADSL VIT A1 antes de la primera puesta en funcionamiento Reparaciones Las tareas de reparación únicamente pueden ser realizadas por personal cualificado Únicamente se pueden utilizar piezas de recambio que no modifiquen las características de seguridad del comprobador Las tareas de mantenimiento y reparación en el comprobador desmontado únicamente pued...

Page 51: ...n de alimentación en la línea de forma analógica o bien UK0 para la correcta conmutación de los hilos a b Por otro lado verifica si es posible la sincronización con el multiplexador DSL Access Multiplexer DSLAM en la central de conmutación Adicionalmente la interfaz Ethernet del comprobador permite conectar un ordenador portátil para consultar una serie de parámetros de conexión ADSL y efectuar lo...

Page 52: ... de alimentación de red cable de medida RJ45 clavija banana cable de medida RJ11 3 4 RJ45 4 5 Fig Bolsa de transporte Adaptador de 12 V alimentación por medio de la batería de vehículos Fig Adaptador para alimentación por medio de la batería de vehículos ...

Page 53: ...ador encendido Con el fin de evitar que se reinicie la secuencia de carga rápida de los acumuladores cada vez que se accione el selector aplicando la tensión de red la carga de los acumuladores no se inicia antes de haber transcurrido un periodo de 10 segundos con el selector en la posición de Off Line Test y conectando a continuación el cable de alimentación de tensión en el terminal DC En tal ca...

Page 54: ...modos de comprobar el correcto establecimiento de la conexión ADSL posición ADSL Test y comprobar la existencia de la tensión de alimentación remota posición Line Test Posición Off Line Test Con el selector en la posición de Line Test el comprobador detecta la existencia de una tensión de alimentación para la conexión analógica o RDSI en la línea comprobada El estado correspondiente se señaliza po...

Page 55: ...nales El actual estado de conexión se señaliza por medio del LED ADSL Test en la parte superior de la caja del comprobador 3 3 Terminal ADSL La conexión entre el comprobador DSL VIT A1 y el punto de medida deseado por ejemplo en el distribuidor principal o el derivador de la línea se establece en la dirección de la central de conmutación por medio del terminal RJ11 ADSL y el cable de unos 2 m de l...

Page 56: ...ordado upstream downstream Para más información consulte la documentación del software que se utiliza para consultar los parámetros Asimismo el terminal LAN permite establecer la comunicación con la red internet por medio de un PC conectado tal y como es el caso utilizando un módem de cliente final ...

Page 57: ...st Este LED se apaga también en la posición de On ADSL Test siempre y cuando el comprobador se desconecte automáticamente en caso de descargarse los acumuladores o bien al desconectar la alimentación de tensión externa Para volver a encender el comprobador en tal caso coloque el selector en la posición de Off Line Test y a continuación nuevamente en la posición de On ADSL Test Si no se utiliza nin...

Page 58: ...n curso de alimentación por batería a alimentación externa en el momento de conectar la fuente exterior en el terminal DC 4 3 LED Charge El LED Charge de color verde se ilumina para señalizar el proceso de carga rápida de los acumuladores colocados en el comprobador Antes de poder iniciar la secuencia de carga rápida primero coloque el selector en la cara frontal de la caja del comprobador en la p...

Page 59: ...ter y el módem del cliente que no están conectados correctamente los hilos a b Este LED también permanece apagado con el selector en la posición de ADSL Test LED Line Test iluminado Se aplica tensión de alimentación en la línea Esto significa que está disponible una red POTS o RDSI y que están conectados correctamente los hilos a y b 4 5 LED ADSL Test Con el selector en la posición de ADSL Test el...

Page 60: ...el handshake según ITU G 994 1 primera fase del establecimiento de la comunicación ADSL LED ADSL Test parpadeando rápido Inicialización ADSL con el DSLAM en curso es decir se está sincronizando y acondicionando según ITU G 992 1 segunda fase del establecimiento de la comunicación ADSL LED ADSL Test iluminado La sincronización con el DSLAM se ha realizado con éxito es decir se ha establecido la com...

Page 61: ...minal RJ45 para consultar los parámetros de conexión ADSL por medio de un PC u ordenador portátil Alimentación de tensión 4 acumuladores NiMH AA Mignon LR6 o bien fuente de alimentación externa Intervalo de funcionamiento aprox 2 5 horas con plena capacidad de acumuladores Secuencia de carga aprox 3 horas con los acumuladores completamente vacíos Modo de carga por medio de una adaptador de vehícul...

Page 62: ...VIERLING 62 70299 202 1 3 20050513 VIT A1 6 Declaración de conformidad ...

Page 63: ...VIERLING VIT A1 70299 202 1 3 20050513 63 ...

Reviews: