Viega Prevista Dry WC Instructions For Use Manual Download Page 1

for WC flush plates for Prevista
Model

Year built:

8525.35

from  04/2019

en_INT

Prevista Dry WC element foot fastening at

rear side 1120 mm

Instructions for Use

Summary of Contents for Prevista Dry WC

Page 1: ...for WC flush plates for Prevista Model Year built 8525 35 from 04 2019 en_INT Prevista Dry WC element foot fastening at rear side 1120 mm Instructions for Use ...

Page 2: ...Prevista Dry WC element foot fastening at rear side 1120 mm 2 from 24 ...

Page 3: ... components 7 2 4 3 Technical data 8 3 Handling 9 3 1 Assembly information 9 3 1 1 Mounting conditions 9 3 1 2 Installation dimensions 10 3 2 Assembly 10 3 2 1 Mounting WC element 10 3 2 2 Connecting concealed cistern 14 3 2 3 Mounting the drain elbow 18 3 2 4 Establish power and water supply optional 19 3 2 5 Set and clad the WC element 20 3 2 6 Setting the flush volume 22 3 3 Cleaning and mainte...

Page 4: ... possible operating instructions The installation of Viega products must take place in accordance with the general rules of engineering and the Viega instructions for use 1 2 Labelling of notes Warning and advisory texts are set aside from the remainder of the text and are labelled with the relevant pictographs DANGER This symbol warns of possible life threatening injury WARNING This symbol warns ...

Page 5: ...IN DVGW Some passages in the text may refer to technical codes in Europe Germany These should serve as recommendations in the absence of corresponding national regulations The relevant national laws stand ards regulations directives and other technical provisions take priority over the German European directives specified in this manual The information herein is not binding for other countries and...

Page 6: ... electric shock can lead to burns and serious injury and even death Work on the electrics may only be carried out by trained electricians Switch off the mains voltage before carrying out work on electrical parts Switch off the mains voltage before connecting the power pack 2 3 Intended use 2 3 1 Areas of use The Prevista Dry WC element is suitable for mounting on masonry wall constructions pursuan...

Page 7: ...r 8 Screws for fixing in support profile 9 Mounting set for WC ceramic 10 flushing pipe 11 WC connection socket with lip seal 12 Fixing set model 8180 73 13 Fixing set model 8570 36 14 Protective plug for flushing pipe elbow 15 Revision shaft cover 16 Corner valve 2 4 2 Compatible components The WC element is compatible with all common WC ceramics even with larger projection barrier free Product i...

Page 8: ... water and power connection is required to extend the WC element to the shower WC Power must be connected on site 2 4 3 Technical data Small flush volume Factory setting approx 3 l setting range approx 2 4 l Large flush volume Factory setting approx 6 l setting range approx 3 5 7 5 l Water pressure min 15 kPa 0 15 bar Water pressure max 1000 kPa 10 bar Connection shower WC Flush volume Water press...

Page 9: ...ction height the marked height of the upper edge of the finished floor must be observed The WC element can be extended by a remote flush actuation or by an electronic actuation as well as by sensitive flush plates The cables for these electrical actuation versions must be laid in front of the cladding The corresponding empty pipe is required when preparing the remote flush actuation Suitable walls...

Page 10: ...and concreted walls When mounting multiple WC elements with an interval of 500 mm Viega recommends the use of a Prevista Dry support bracket model 8570 48 Observe the instructions for use of the support bracket when mounting Handling Prevista Dry WC element foot fastening at rear side 1120 mm 10 from 24 ...

Page 11: ...dowels Mount the mounting bracket Align and fix the wall brackets Determine and mark the fixing points on the wall n X3 388 mm n X4 50 mm Drill the holes Insert the dowels Mounting to a masonry wall 9 9 9 9 9 Handling Prevista Dry WC element foot fastening at rear side 1120 mm 11 from 24 ...

Page 12: ...ction height of the element in accordance with the on site marking of the upper edge of the finished floor n X 1000 mm Tighten the feet of the element using a fork spanner Set the depth of the element and fasten 9 Handling Prevista Dry WC element foot fastening at rear side 1120 mm 12 from 24 ...

Page 13: ...nt and use the slide to attach the mounting bracket to the threaded rods Loosely insert the caps INFO Do not press on the caps to engage them Re adjust the alignment of the element using the threaded rods Handling Prevista Dry WC element foot fastening at rear side 1120 mm 13 from 24 ...

Page 14: ...il they engage ð The element is attached to the wall 3 2 2 Connecting concealed cistern Turn the cover plate lock 90 in anti clockwise direction Handling Prevista Dry WC element foot fastening at rear side 1120 mm 14 from 24 ...

Page 15: ...Remove the cover plate Remove the plug Insert an empty pipe Fasten the empty pipe in the cistern Mount the screw fittings Handling Prevista Dry WC element foot fastening at rear side 1120 mm 15 from 24 ...

Page 16: ...Mount the corner valve Fasten the corner valve Connect the corner valve Insert the cover plate into the cistern Handling Prevista Dry WC element foot fastening at rear side 1120 mm 16 from 24 ...

Page 17: ...ck by 90 in a clockwise direction Place the revision shaft on the cover plate To remove the revision shaft press in the fixing clips at the side Handling Prevista Dry WC element foot fastening at rear side 1120 mm 17 from 24 ...

Page 18: ...Insert the mounting bracket for the drain elbow Insert the drain elbow to the desired depth Fasten the drain elbow using the bow Fit the site protection Handling Prevista Dry WC element foot fastening at rear side 1120 mm 18 from 24 ...

Page 19: ... Switch off the mains voltage before carrying out work on electrical parts Switch off the mains voltage before connecting the power pack Lay the power supply for an electric flush plate up to the cavity wall socket Lay the power pack cable for an electric flush plate through the empty pipe Lay the water pipe for a shower WC through the empty pipe Handling Prevista Dry WC element foot fastening at ...

Page 20: ...nter the threaded rods in front of and after the element with a nut Place the protective caps on the threaded rods Corn a suitable gypsum cladding panel at the revision shaft and at the site protection by applying gentle pressure Cut out the recesses for the site protection the revision shaft and the threaded rods Handling Prevista Dry WC element foot fastening at rear side 1120 mm 20 from 24 ...

Page 21: ...Clad the element with suitable gypsum cardboard cladding panels Handling Prevista Dry WC element foot fastening at rear side 1120 mm 21 from 24 ...

Page 22: ... freely accessible n The water supply has been shut off n The ceramic has been mounted Fold the tabs forward Lift the drain valve Remove the drain valve through the revision opening Handling Prevista Dry WC element foot fastening at rear side 1120 mm 22 from 24 ...

Page 23: ...Set the large flush volume at the drain valve Set the small flush volume at the drain valve Handling Prevista Dry WC element foot fastening at rear side 1120 mm 23 from 24 ...

Page 24: ...seals renewed In areas or regions with hard water due to high concentration of calcium or magnesium salts there is the risk of limescale deposits developing on the inlet and drain valves The valves may have to be replaced depending on the extent of the deposits 3 4 Disposal Separate the product and packaging materials e g paper metal plastic or non ferrous metals and dispose of in accordance with ...

Reviews: