Viega Advantix base unit Instructions For Use Manual Download Page 1

for bonded sealing (tiled shower) with sealing mat
Model

Year built:

4938

from  01/2006

en_INT

Advantix bath drain

Instructions for Use

Summary of Contents for Advantix base unit

Page 1: ...for bonded sealing tiled shower with sealing mat Model Year built 4938 from 01 2006 en_INT Advantix bath drain Instructions for Use...

Page 2: ...Advantix bath drain 2 from 21...

Page 3: ...cal data 8 2 4 Information for use 8 2 4 1 Installation variations 8 2 4 2 Sealing 10 2 4 3 Fire protection 12 2 5 Required accessories 12 3 Handling 14 3 1 Assembly information 14 3 1 1 Important not...

Page 4: ...on does not extend to possible operating instructions The installation of Viega products must take place in accordance with the general rules of engineering and the Viega instructions for use 1 2 Labe...

Page 5: ...or in Germany e g DIN DVGW Some passages in the text may refer to technical codes in Europe Germany These should serve as recommendations in the absence of corresponding national regulations The relev...

Page 6: ...AO ETAG 022 T1 Approved bonded sealings with proof of practicability in keeping with building law for stress classes A B and C DIBt Bauregelliste A Teil 2 des DIBt und Pr fgrunds tze f r Abdichtungen...

Page 7: ...r draining of household type wastewater in con stant operation see Regulations from section Media on page 6 n The short term temperature of the wastewater may reach up to 95 C The temperature must be...

Page 8: ...nal width DN inlet 40 Drainage capacity Chapter 2 2 3 Drainage capacity on page 7 Dimensions and installa tion height Chapter 3 1 2 Installation dimen sions on page 15 Water seal level 30 mm Load clas...

Page 9: ...drill hole in the floor at the same time NOTICE The creation of a floor recess must be agreed with the fol lowing people a structural engineer the on site fire protection inspector or the specialist...

Page 10: ...of the stress class and the underground as well as the selection of the suitable bonded sealing must be carried out in compliance with the valid standards and regulations see Regula tions from sectio...

Page 11: ...ver a width of at least 50 mm must be used n The screed must be laid at a minimum incline of 1 2 n The installation must be carried out properly in acc with the mounting instructions and the manufactu...

Page 12: ...5 Example fire protection pipe lead in Mounting instruction of the R120 pipe lead in see model 4923 5 Art No 491 673 2 5 Required accessories A top must be purchased separately to complete the mounti...

Page 13: ...n additional odour barrier which also closes the drain odour tight if the water seal in the odour trap has evaporated Odour nuisance is even avoided with drains that are only seldom used Odour barrier...

Page 14: ...ight of the drain corresponds with the planned floor construction n Ensure that the required connection line is installed with the neces sary incline to the planned installation location n If necessar...

Page 15: ...ly 3 2 1 Connecting the drain The connection to the wastewater system must be completed before the drain can be installed in the floor construction Proceed as follows Requirements n A pipe to the plan...

Page 16: ...rst be made to be able to mount the drain Proceed as follows Requirements n Inlet pipe has been mounted Unscrew the union nut from the drain inlet Remove protective plug Remove sliding ring and sealin...

Page 17: ...connected n The protective foil and the yellow protective plugs are to be found undamaged on the drain Position the drain at the desired height at the place of use It is important that the upper edge...

Page 18: ...E Product damage due to improper installation If hollow spaces occur during the lining of the drain leaks may occur when pressure is applied Check the proper completion of the subsequent work Screed a...

Page 19: ...rer s instructions for use Lay the sealing collar into the bonded sealing Apply a second layer of bonded sealing onto the sealing collar and if necessary onto the floor 3 2 4 Mounting the top The top...

Page 20: ...Work the top into the screed or the floor covering 3 3 Care 3 3 1 Care tips Normal soap or a mild cleaning agent can be used for regular mainte nance and prevention of lime scale on the grate and fra...

Page 21: ...n drain Replace immersion pipe Re insert grate 3 4 Disposal Separate the product and packaging materials e g paper metal plastic or non ferrous metals and dispose of in accordance with valid national...

Reviews: