3 Handling
3.1
Assembly information
3.1.1
Important note
During assembly:
n
Observe installation dimensions.
After assembly:
n
The shower channel must be fully lined with mortar.
n
Coordinate all relevant installation details, especially regarding the
bonded sealing, with those responsible for the subsequent work.
3.1.2
Installation dimensions
Fig. 2: Dimensions
Model
Art. no.
Length
4982.45
745 356
745 363
745 370
745 387
745 394
750
800
900
1000
1200
Handling
Advantix shower channel mounting frame
7 from 9