background image

for one-pipe concealed ventilators, manifolds, water meters,
heat flow meters

Model

Year built:

8062.5

from  02/1997

en_INT

Universal bracket

Instructions for Use

Summary of Contents for 8062.5

Page 1: ...for one pipe concealed ventilators manifolds water meters heat flow meters Model Year built 8062 5 from 02 1997 en_INT Universal bracket Instructions for Use ...

Page 2: ...Universal bracket 2 from 11 ...

Page 3: ...and regulations 6 2 2 Intended use 6 2 2 1 Areas of use 6 2 3 Product description 7 2 3 1 Overview 7 2 3 2 Sound protection 7 3 Handling 8 3 1 Assembly information 8 3 1 1 Mounting conditions 8 3 1 2 Installation dimensions 8 3 1 3 Required tools 8 3 2 Assembly 9 3 2 1 Mounting module 9 3 2 2 Rounding off jobs 10 3 3 Disposal 11 Table of contents Universal bracket 3 from 11 ...

Page 4: ... not extend to possible operating instructions The installation of Viega products must take place in accordance with the general rules of engineering and the Viega instructions for use 1 2 Labelling of notes Warning and advisory texts are set aside from the remainder of the text and are labelled with the relevant pictographs DANGER This symbol warns against possible life threatening injury WARNING...

Page 5: ...d or in Germany e g DIN DVGW Some passages in the text may refer to technical codes in Europe Germany These should serve as recommendations in the absence of corresponding national regulations The relevant national laws stand ards regulations directives and other technical provisions take priority over the German European directives specified in this manual The information herein is not binding fo...

Page 6: ...1045 Regulations from section Sound protection Scope Notice Regulations applicable in Ger many Fulfilled noise protection require ments DIN 4109 Fulfilled noise protection require ments DIN 4109 additional sheet 2 Fulfilled noise protection require ments VDI 4100 SSt I SSt II 2 2 Intended use 2 2 1 Areas of use The model is suitable for mounting on wall constructions pursuant to the regulations in...

Page 7: ...ivery 1 slot nuts 2 universal bracket 3 fixing material 2 3 2 Sound protection The model complies with the noise insulation requirements specified in section Ä Regulations from section Sound protection on page 6 Product information Universal bracket 7 from 11 ...

Page 8: ...eight the marked height of the upper edge of the finished floor must be observed 3 1 2 Installation dimensions Fig 2 Dimensions 3 1 3 Required tools The following tools are required for mounting n fork or ring spanner 17 mm 19 mm Construction height Handling Universal bracket 8 from 11 ...

Page 9: ...of 430 mm Secure the element onto the open Steptec rail with the slot nuts supplied Insert the slot nut into the opening of the module Push the slot nut in slightly Turn by 90 ð The slot nut is secured in the Steptec rail Set the height Tighten the slot nut with a ring spanner SW 17 Mounting in Steptec Handling Universal bracket 9 from 11 ...

Page 10: ...nt manufacturer s instruc tions Make sure that the fixing ends flush with the rail framework The fixing may extend for a maximum of 1 5 mm beyond the rail frame work Set depth settings The depth of the bracket can be set to 70 155 mm Carry out before cladding of the installation and fixing of the building project 3 2 2 Rounding off jobs Handling Universal bracket 10 from 11 ...

Page 11: ...Grout the abutting edges and joints with a suitable filler Observe the instruction manual for the cladding panels for more information 3 3 Disposal Separate the product and packaging materials e g paper metal plastic or non ferrous metals and dispose of in accordance with valid national legal requirements Handling Universal bracket 11 from 11 ...

Reviews: