Align the base using a spirit level.
Tighten the nut.
Repeat the process for fastening the base at the other side.
Further see
Chapter 3.3.2 „Connecting the flush valve to the pipe-
Select the fixing material in accordance with the underground.
Align the base using a spirit level.
Mark the positions for the dowel holes.
Drill holes and insert dowels.
Put the base on the dowels and hand-tighten the screws.
Align the base once more using a spirit level, and tighten the
screws.
The distance between the base and the front edge of the finished
wall must be 15 to 50 mm. This ensures that the cover can be pro-
fessionally mounted later.
Further see
Chapter 3.3.2 „Connecting the flush valve to the pipe-
Select the fixing material in accordance with the underground.
Concealing mounting
4x
15 - 50 mm
Wall mounting
Handling
Flush valve universal
32 from 62