background image

For flushing stations with Viega function
Model

Year built:

2241.68

from  11/2017

en_INT

BMS module binary

Instructions for Use

Summary of Contents for 2241.68

Page 1: ...For flushing stations with Viega Hygiene function Model Year built 2241 68 from 11 2017 en_INT BMS module binary Instructions for Use...

Page 2: ...BMS module binary 2 from 12...

Page 3: ...2 Product description 6 2 2 1 Overview 6 2 2 2 Technical data 7 3 Handling 8 3 1 Assembly information 8 3 1 1 Required material and tools 8 3 2 Assembly 8 3 2 1 Mounting the BMS module on the basic ho...

Page 4: ...riction does not extend to possible operating instructions The installation of Viega products must take place in accordance with the general rules of engineering and the Viega instructions for use 1 2...

Page 5: ...or in Germany e g DIN DVGW Some passages in the text may refer to technical codes in Europe Germany These should serve as recommendations in the absence of corresponding national regulations The rele...

Page 6: ...table exclusively for flushing stations with Viega Hygiene function models 2241 10 and 2241 20 For detailed installation instructions refer to the instructions for use for the flushing station 2 2 Pro...

Page 7: ...ng binary inputs and binary outputs of building auto mation n connection adapter n Splash water protected IP54 n 8 inputs signals from building automation potential free n 12 outputs signals for build...

Page 8: ...tionally the clamp type terminals are colour coded alternately The twelve binary outputs of the BMS module are marked O1 to O12 Addi tionally the clamp type terminals are colour coded alternately Rem...

Page 9: ...of the mounting holes Drill the mounting holes bore diameter 3 mm Use the self tapping screws to fasten the BMS module on the basic holder system Mounting with self tapping screws Handling BMS module...

Page 10: ...e Unscrew the cable screw connection Remove the protective plug Screw the connection on Insert the connection cable max 14 x 2 x 0 8 single core max 0 8 mm approx 0 5 mm2 Tighten the cable screw conne...

Page 11: ...ts The binary outputs of the BMS module relay contact NO contact con trol the inputs of the building automation potential free max 24 V 100 mA 3 3 Commissioning 3 3 1 Commissioning the BMS module in a...

Page 12: ...non ferrous metals and dispose of in accordance with valid national legal requirements Electronic components and batteries must not be put in the domestic waste but must be disposed of appropriately i...

Reviews: