background image

1

1x2

Installation Manual

Summary of Contents for VicBooth Ultra

Page 1: ...1 1x2 Installation Manual ...

Page 2: ...2 ...

Page 3: ...loor 2 uni Ceiling 2uni Structure 8 uni A B C D E F G H I J Not included Bubble Level 6mm Phillips Screwdriver 2 uni Box Cutter 64 uni 32 uni 32 uni 30 uni 84 uni 30 uni 12 uni 6 uni 8 uni 16 uni X 4 mm 2 uni 5 mm 1 uni K 6 uni Foam seal scissors 1 uni W ...

Page 4: ...ach of the floor structures Place the Floor Structures on the ground according to the diagram Trim the supplied foam seal to match the base width Apply foam seal on one side of the contact surface to ensure an acoustic seal Step s Material scissors Foam seal ...

Page 5: ...5 Step s Material Join the floor structures using the 63mm screws K and the flat heads E Use the 4mm Hex Keys X E K E K 3 4 X X 4mm 4mm ...

Page 6: ...at they touch the floor 5 15mm 0 59 The precise leveling of the floor structure is crucial for the correct assembly and operation of the VicBooth Ultra use a bubble level Make sure the floor structure is in its final position once assembled the VicBooth Ultra should not be moved Unscrew the four floor levelers of the outside corners of the set to half their length about 15 mm 0 59 in as shown in t...

Page 7: ...7 Step s Material 6 7 A B Insert wooden dowels A in the floor structure according to the diagram Screw the metal fittings B in the floor structure according to the diagram Step s Material ...

Page 8: ...8 8 Insert the locking cams C in the Structure Pillars and insert the wooden dowels A in the top end of the structure pillars Step 2 Step s Material C A 1 uni Step 1 ...

Page 9: ...pply the foam seal on one side of the contact surface of the structure pillars to ensure an acoustic seal only applies on 2 pillars on the side that is in contact between the parts Step s Material Foam seal ...

Page 10: ... floor structure according to the diagram and rotate the locking cams C by hand using a screwdriver make sure the beams are completely inserted before rotating the locking cams to the locked position Step s Material 6mm Phillips Screwdriver ...

Page 11: ...11 11 Join the structure pillars using the 31mm screws G and the flat heads E Use the 4mm Hex Keys X E X X 4mm 4mm G Step s Material ...

Page 12: ...e ceiling structure the PET and Vicycle layers stay attached to the top cover Trim the supplied foam seal to match the ceilling width Apply the foam seal on one side of the contact surface to ensure an acoustic seal 12 13 scissors Foam seal Step s Material ...

Page 13: ...13 B Screw the metal fittings B in the ceilling structure according to the diagram 14 15 Step s Material ...

Page 14: ... structure pillars according to the diagram and rotate the locking cams C by hand using a screwdriver make sure the structures are completely inserted before rotating the locking cams to the locked position Step s Material 6mm Phillips Screwdriver ...

Page 15: ...nels are placed in the correct position according to the diagram below Each side is composed by a PET panel covered with fabric and an MDF panel with melamine 16 Join the ceilling structures using the 63mm screws K and the flat heads E Use the 4mm Hex Keys X Step s Material E K X X 4mm 4mm ...

Page 16: ...s to be used The Side Panels are fixed using the 42mm screws F on the top and lower ends and the 28mm screws D on the sides Use the flat heads E and the 4mm Hex Keys X Make sure the holes are aligned before placing the screws You can use two screwdrivers to help align the holes in the center of the panel We advise one person to align the panels with the help of the screwdrivers and the other one t...

Page 17: ...the Door H E G 3 H 5 H 4 H 12 G 11 G 2 G 1 G 10 G 9 G 8 H 7 H 6 H Fit the Door Frame using the 45mm screws H on the top and lower ends and the 31mm screws G on the sides Use the flat heads E and the 4mm Hex Keys X E X X 4mm 4mm G H V Step s Material ...

Page 18: ... bolts following the order of fixing the screws as described in the diagram and the indications concerning the type of screws to be used 20 Fit the door by carefully sliding the hinges down into the hinge shaft on the Door Frame You can also use the metal spacer as a bottle opener ...

Page 19: ...ible to the door and guarantees perfect contact between the two surfaces 21 Please re check the leveling of the floor structure If necessary make final adjustments to ensure the correct functioning of the door 22 Place the PET layers in the floor Structures Fit the floor panels Make sure the PET layers and the floor panels are placed in the correct position by checking the diagram X X 4mm 4mm Step...

Page 20: ...20 J 23 Place the top covers on the ceiling structures according to the diagram Fit the ceiling panels using the J screws Fit the ceiling panels using the J screws Step s Material ...

Page 21: ...21 I 24 Fit the ceiling panels using the I screws make sure the ventilation slots are aligned with the slots on the underside of the top panels Step s Material ...

Page 22: ...eed to insert a cable into VicBooth Ultra you must do so from the inside out Lift the cable entry cover and force the plug through the layers of PET so that it runs out through the cutout made for this purpose 25 ...

Page 23: ...23 ...

Page 24: ...t written consent of Vicoustic Main Office R D Logistics Avenida do Pólo 3 Nº 159 Carvalhosa 4590 137 Paços de Ferreira Portugal Office Rua Quinta do Bom Retiro Nº 16 Armazém 9 2820 690 Charneca da Caparica Portugal T 351 212 964 100 Info and Sales E sales vicoustic com www vicoustic com ...

Reviews: