
Before first use
33
Before first use
Inspection of the
supplied machine
The machine would generally be assembled and delivered ready-for-
use by the dealer. The dealer is also responsible for providing instruc-
tions for use and maintenance. He/she must also ensure that the
required documents are provided, such as:
•
manual,
•
spare parts manual
•
spreading chart book,
•
testing and approval documents where required.
If parts are missing or have been damaged during transport, you
should report that to your dealer directly on delivery.
Mounting instruc-
tions
Before the machine can be used, various parts and supplied
accessories must be unpacked and assembled.
T
IP
In addition to these assembly instructions, use the parts book to locate
the parts and their positions on the machine.
Use sturdy hoisting equipment
Use the hoisting points on the machine to hook up your approved
slings or hoisting chains.
If the machine is hoisted incorrectly or with inferior equipment it could
fall from the sling, resulting in material damage and possible physical
injury.
Work on a clean surface
Before you start mounting, you should clean the surface and the
directly surrounding area where you place the machine.
A machine that is placed on pieces of packaging or parts, may slide
away during mounting with material damage and possibly physical
injury as a result.
Accessories and parts must be correctly mounted
Assemble accessories and parts according to specifications and
attach them only for their designated purpose; ensure that it is locked
correctly. Accessories and parts which are not fastened securely could
lead to personal injury and damage to the crop and machine.
Hoisting points
Summary of Contents for RO-C 1400
Page 4: ...Table of contents 4...
Page 139: ...Maintenance 139 109 mm Rope Discharge bushing Position V Mechanical...
Page 153: ...Notes 153 Notes...