Hitching the implement
37
The implement attachment is provided with the fittings required to
hitch it to the tow jaw coupling of a tractor ex works.
The following work steps must be observed when coupling the imple-
ment:
•
The tractor and the implement must be standing on firm, secure,
level ground.
•
The drawbar must be adjusted.
•
The drawbar eye must be adjusted.
•
The drawbar must be coupled.
•
The AutoPlus-Pilotbox electrical connections must be connected.
•
The parking brake [+] must be connected.
•
The hydraulic tubes must be connected.
•
The pneumatic tubes [+] must be connected.
•
The lighting electrical connections must be connected.
•
The sustainer must be inserted.
Manoeuvring
If the implement is equipped with the “load-dependent brake” acces-
sory, the following provisions must be carried out before manoeuvring:
> Hitch the implement.
> Raise and secure the sustainer.
> Release the parking brake lever.
> Move the brake lever to the “released” position.
> Manoeuvre the implement.
> Move the brake lever to the “full load” position.
> Activate the parking brake lever and secure the implement against
rolling away.
→
See »Parking brake [+]«, page 41.
Half load
Full load
Release
Brake lever
Empty
Brake valve
Summary of Contents for RF 2235
Page 5: ...Inhaltsverzeichnis 5...