Final tasks
70
Trial run
Referring to the operating manual, adjust the machine and carry
out a trial run.
Check the following after the assembly process:
•
Length of PTO shaft. See »Length of the PTO shaft«, page 47.
•
All bolts and torques.
•
Correct routing of the hydraulic hoses and electrical cables.
•
Hydraulic connections (based on the components).
Extend and retract the hydraulic cylinders from the end position at
least 10 times in order to bleed the cylinders.
Once complete, check the hydraulic system for leaks.
No persons within the slewing range
There is an extreme risk of injury within the slewing range from
slewing or folding machine parts.