background image

G3-GS-8P-192T

Hardware Installation

7 Apr 2020

Summary of Contents for G3-GS-8P-192T

Page 1: ...G3 GS 8P 192T Hardware Installation 7 Apr 2020 ...

Page 2: ...emperature storage 4 F 149 F 20 C 65 C Compliance RoHS FCC CE 1 For SFP the SFP may be any of Copper 10 100 1000 1Gb SX LX For SFP the SFP may be any of 10Gb SR LR For QSFP the QSPF may be any 40Gb SR LR BiDi Universal For QSFP28 the QSFP28 tranceivers may be SR4 LR4 or BIDI Parts list Each appliance comes packed in a box or several boxes The boxes contain the various components necessary for a su...

Page 3: ...3 Quick start for experienced installers Quick start for experienced installers First time installers should use the information on the next page ...

Page 4: ...n the TAP b Connect the TX port from your other switch to the Link B port on the TAP c Use two analyzer cables to connect the analyzer port on the TAP to the SFP transceivers in the capture card d If you have more than one TAP to connect repeat the process for each TAP 12 Connect a monitor keyboard and mouse to the hardware appliance You can use a KVM switch if desired The KVM must be compatible w...

Page 5: ...esence Prerequisite s A KVM switch or keyboard monitor and mouse are connected The user input devices or KVM switch are only temporarily needed to set the IP address so you can disconnect them after the IP address is set The IP subnet and gateway or router addresses are available and known to you 1 Log in to the Windows operating system using the Administrator account and its default password admi...

Page 6: ...tion SMTP To receive SNMP traps change the settings at Configuration SNMP To receive Syslog messages change the settings at Configuration Syslog You configured the IPMI port and changed the default password You may have also configured your system to send alerts when certain situations arise How to configure the JBOD IPMI port The JBOD chassis offers intelligent management with IPMI providing hard...

Page 7: ...the front of the chassis to hook the inner rail onto the side of the chassis 4 Optional If desired secure the rail with two flat head M4 x 4mm screws and washers as illustrated 5 Repeat for the other inner rail 6 Identify the outer rack rails 7 Press upward on the locking tab at the rear end of the middle rail 8 Push the middle rail back into the outer rail 9 Hang the hooks on the front of the out...

Page 8: ...g the chassis when removing it from the rack Use a server lift 1 Pull the chassis forward out the front of the rack until it stops 2 Press the release latches on each of the inner rails downward simultaneously and move the chassis forward in the rack Technical Support Please contact technical support if your issues are not represented or you need further help North America 1 800 526 7919 South Ame...

Reviews: