
5.3 Machine installation (schema)
You can
either
use the switching unit including
the control cable
or
the data cable of supported
suction units. The data cable must be provided
by the manufacturer of the suction unit.
How to install the vhf wet grinding module is
described in the operating instructions for the
module.
The operating instructions are delivered with
the vhf wet grinding module. They are also
available for download at:
https://www.dentalportal.info/NO1
F
IG
. 10 M
ACHINE INSTALLATION
(
SCHEMA
)
1. Power connection
2. USB cable
3. Pneumatic hose
4. Suction unit
5. External compressed air supply
6. Data cable of supported suction units (optional)
7. Control cable of the switching unit (optional)
8. Suction hose
9. Switching unit (optional)
S5 – Installing the machine
EN 19
Original Operating Instructions: S5
Version: 12/15/2021