At least once per month inspect the following:

 

1.  Stairway: examine the stairway for cracked welds, broken rungs, and severe corrosion. Remove 

rust/corrosion with steel wool or a steel bristle brush and apply touchup paint to the affected areas. 

2.  Stairway mounting frame (see p. 11): inspect the connections to the mezzanine. Make sure that mounting 

hardware is in normal condition. Check the bolt holes in the mounting frame for elongations, cracks, and 

corrosion. Examine the pin slots for bends and damage that affects the travel of the push bar. Remove 

corrosion. If cracks are found, contact the manufacturer. 

3.  Jack support and jack slide (see pages 11 & 12): inspect the bolts slots and the bolt holes in the mounting 

plate. Check for elongations, cracks, and corrosion. Examine the slide retaining tube for bends, cracks, etc. 

4.  Handrails: closely examine all hardware. Tighten loose connections. Confirm that detent pins work properly 

(see p. 15) and securely fit inside the detent pin brackets. Check the handrails for bends and cracks, 

particularly around the handrail splices and connections at each end. Both handrails should be rigid and 

undamaged. Replace all damaged sections of the handrails before returning the stair system to service. 

5.  Jack: operate the jack in forward and reverse modes to determine if it is functioning properly. Replace the 

jack if it malfunctions or is damaged. 

6.  Labels: the stairs should always be labeled as shown in the “Labeling diagram” (below). Replace a label 

that is missing, damaged or not easily readable, e.g. faded. 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Labeling diagram:

 

Each unit should be labeled as shown in the diagram. However, label content and locations are 

subject to change so your product might not be labeled exactly as shown. Compare the diagram 

below to your 

Record of Normal Condition

. If there are any differences between actual labeling and 

this diagram, adapt the diagram to reflect actual labeling. Replace all labels that are damaged, 

missing, or not easily readable (e.g. faded). To order replacement labels or to inquire whether your 

unit is properly labeled, contact the technical service and parts department online at 

http://www.vestilmfg.com/parts_info.htm

 or by calling (260) 665-7586 and asking for the Parts 

Department.

 

 

A: Label 821 

 

B: Label 740 

 

C: Label 287 

 

Summary of Contents for LAD-FM-108

Page 1: ...Service and Parts Department at 260 665 7586 The department can also be contacted online at http www vestilmfg com parts_info htm Table of Contents Signal words 2 Hazards of using the stair system 2 S...

Page 2: ...oper use and maintenance procedures DO NOT exceed the maximum rated load Inspect the stairs at least once per month according to the instructions in the Inspections section on p 17 DO NOT use these st...

Page 3: ...m 253 lb 115 kg LAD FM 72 350 lb 159 kg 9 23 cm 493 4 126 5 cm 145 8 37 cm 72 183 cm 1035 8 263 cm 276 lb 125 5 kg LAD FM 84 350 lb 159 kg 93 8 24 cm 571 2 146 cm 1413 16 38 cm 84 213 cm 1155 8 294 kg...

Page 4: ...44 514 277 Weldment frame roller bracket right 1 18 11115 Hex bolt HHCS 2 zinc plated 3 8 16 x 3 1 6 44 016 081 Bracket handrail mount 4 19 36106 Hex nut gr A zinc plated 3 8 16 1 7 44 524 093 Weldme...

Page 5: ...racket right 1 19 36106 Hex nut gr A zinc plated 3 8 16 1 6 44 016 081 Bracket handrail mount 4 20 65127 Cotter pin zinc plated 3 8 x 2 2 7 44 524 093 Weldment handrail hinge right 1 21 11107 Hex bolt...

Page 6: ...4 1 25 W 2 21 33018 USS flat washer zinc plated 3 4 2 7 44 514 277 Weldment frame roller bracket right 1 22 11113 Hex bolt grade A plain finish 3 8 16 x 2 1 2 10 8 44 016 081 Bracket handrail mount 4...

Page 7: ...4 1 25 W 2 21 33018 USS flat washer zinc plated 3 4 2 7 44 514 277 Weldment frame roller bracket right 1 22 11113 Hex bolt grade A plain finish 3 8 16 x 2 1 2 10 8 44 016 081 Bracket handrail mount 4...

Page 8: ...4 1 25 W 2 21 33018 USS flat washer zinc plated 3 4 2 7 44 514 277 Weldment frame roller bracket right 1 22 11113 Hex bolt grade A plain finish 3 8 16 x 2 1 2 10 8 44 016 081 Bracket handrail mount 4...

Page 9: ...P 4 1 25 W 2 21 33018 USS flat washer zinc plated 3 4 2 7 44 514 277 Weldment frame roller bracket right 1 22 11113 Hex bolt grade A plain finish 3 8 16 x 21 2 10 8 44 016 081 Bracket handrail mount 4...

Page 10: ...lkway capable of supporting AT LEAST the combined weight of the stairway plus the maximum rated load see Specifications table on p 3 Step 1 Select the location where the stairs will be installed D Att...

Page 11: ...ons are shown below Make a line that extends 8 on both sides of point D on the wall or mezzanine The line must be parallel to the floor Next draw a plumb line at both 8 marks lines are labeled a and b...

Page 12: ...tach the wheels to the side rails of the lower step weldment NOTE Models LAD FM 60 and LAD FM 72 only have an upper and a lower step weldment Slide a 3 8 flat washer onto two 3 8 16 x 2 bolts then ins...

Page 13: ...1 Lift the top end of the stairway with a hoist or a fork truck 2 Align the pin holes in the side rail mounting brackets with the pin slots in the stair mounting frame and the top of the push bar 3 In...

Page 14: ...d below to secure the connections Step 9B Attach the handrails to the stairway mounting frame Move the jack direction selector to the down position see diagram on p 10 Move the jack handle back and fo...

Page 15: ...airway side rails with 3 8 hardware Install 3 8 16 x 2 1 2 bolts through the bolts holes 2 in the handrail mounting bracket and the bottom holes of the brackets Secure the bolts with 3 8 16 lock nuts...

Page 16: ...system into storage position without using the jack 1 Jack direction selector must be in the UP position see FIG 7 on p 10 2 Pull the detent pins out of the pin brackets 3 Slide the bottom of each po...

Page 17: ...t pin brackets Check the handrails for bends and cracks particularly around the handrail splices and connections at each end Both handrails should be rigid and undamaged Replace all damaged sections o...

Page 18: ...ulic pumps motor controllers and cylinders It also covers defects in original parts that wear under normal usage conditions wearing parts such as bearings hoses wheels seals brushes and batteries How...