Soap-based lithium grease with NLGI 3; ISO-L-
XBCHA3, DIN K3K-20
Refitting the front wheel
- When refitting, tighten the 5 screws to the speci-
fied torque
Locking torques (N*m)
Nut tightening torque
20 to 25 N•m
Handlebar
Removal
Before carrying out these operations, remove the
instrument panel.
- After removing the transmissions and discon-
necting the electrical terminals, remove the termi-
nal fixing the handlebar to the steering.
- Check all components and replace faulty parts.
N.B.
IF THE HANDLEBAR IS BEING REMOVED TO REMOVE
THE STEERING, TILT THE HANDLEBAR FORWARD TO
AVOIDING DAMAGING THE TRANSMISSIONS.
Refitting
Carry out the operations in the reverse order to the
removal, observing the prescribed tightening tor-
que.
Locking torques (N*m)
Handlebar lock nut
45 ÷ 50
Vespa LXV 50
Suspensions
SUSP - 95
Summary of Contents for LXV 50
Page 4: ......
Page 6: ...INDEX OF TOPICS CHARACTERISTICS CHAR ...
Page 15: ...INDEX OF TOPICS TOOLING TOOL ...
Page 26: ...INDEX OF TOPICS MAINTENANCE MAIN ...
Page 36: ...INDEX OF TOPICS TROUBLESHOOTING TROUBL ...
Page 42: ...INDEX OF TOPICS ELECTRICAL SYSTEM ELE SYS ...
Page 58: ...020334Y Multiple battery charger Electrical system Vespa LXV 50 ELE SYS 58 ...
Page 59: ...INDEX OF TOPICS ENGINE FROM VEHICLE ENG VE ...
Page 61: ...INDEX OF TOPICS ENGINE ENG ...
Page 92: ...INDEX OF TOPICS SUSPENSIONS SUSP ...
Page 108: ...INDEX OF TOPICS BRAKING SYSTEM BRAK SYS ...
Page 114: ...INDEX OF TOPICS CHASSIS CHAS ...
Page 120: ...INDEX OF TOPICS PRE DELIVERY PRE DE ...
Page 124: ...INDEX OF TOPICS TIME TIME ...