INSTALLATION
This section provides instructions for connecting cables, mounting, and testing the XT+ Releasing Control Unit
for installation. The following is a general checklist for the installation of the unit. Detailed instructions are
provided for each step.
IMPORTANT!
The XT+ Releasing Control Unit installation must be performed by qualified service personnel.
Maintain extreme care when anchoring the cabinet to the premises wall. Electronic components within the unit are
vulnerable to physical damage from severe shock and vibration. Remove the cabinet door and fascia from the cabinet
when installations cannot guarantee vigilant care during cabinet anchoring.
Task
q
Obtain required mounting hardware, tools, and batteries.
q
Disconnect ground cables and all pre-installed wiring.
NOTE
It is recommended that a photo is taken of the factory wiring for ease of reinstallation.
q
Open and remove the door and fascia from the cabinet.
q
Disconnect and remove the power supply from the cabinet.
q
Anchor the empty cabinet to the premises wall.
q
Thread the cabling into the cabinet.
q
Reinstall the power supply and fascia.
q
Reconnect all factory pre-installed wiring.
q
Connect all field wiring.
q
Reinstall the door and reconnect ground cables.
q
Place standby batteries in the base of the unit and connect them to the power supply.
q
Apply power to the unit from the AC source.
q
Configure the unit using Loop Explorer 2.
q
Test the installation.
Installation
VES Fire Detection Systems
XT+ Releasing Control Unit Installation Manual
Version 1.00 | December 2018 | MAN-1252VES
Page 17