Vertiv™ NetSure™ ITS 12V DC Power Shelf Installation & User Manual
2
Rectifier Modules
The system ontains rectifier modules, which provide load power. Refer to the Rectifier Instructions (UM1R123000) for more
information.
3
Installation Acceptance Checklist
Provided below is an Installation Acceptance Checklist. This checklist helps ensure proper installation and initial operation of the
system. As the procedures presented in this document are completed, check the appropriate box in this list. If the procedure is not
required for your installation site, also check the box in this list to indicate that the procedure was read. When installation is done,
ensure that each block in this list has been checked.
NOTE!
The system is not powered up until the end of this checklist.
NOTE!
Some of these procedures may have been performed at the factory for you.
Installing the System
Equipment Inspection Completed
Module Mounting Assembly(s) Mounted in an IT Rack
Making Electrical Connections
System Frame Grounding Connection Made
+12 VDC Output Connections Made
External Alarm, Reference, Monitoring, and Control Connections Made
SCC Controller Ethernet Connection Made
AC Input and AC Input Equipment Grounding Connections Made
Installing the Modules
Rectifier Modules Installed, as required
Initially Starting the System
System Started, Configured, and Checked
4
Installing the System
4.1
General Requirements
•
This product is intended only for installation in a restricted access location on or above a non-combustible surface.
•
This product must be located in a controlled environment with access to craft persons only.
•
This product is intended for installation in data centers or network telecommunication facilities (CO, vault, hut, or other
environmentally controlled electronic equipment enclosure).