![Vertiv NetSure
7100 Series Installation Manual Download Page 74](http://html.mh-extra.com/html/vertiv/netsure-7100-series/netsure-7100-series_installation-manual_1007935074.webp)
Vertiv
|
NetSure 7100 Series -48V DC Power System Installation Manual (IM582127000)
|
Rev. BB
74
Table 3:
SM-DU Switch Settings (cont’d on next page)
DIP Switch S1
Communication
Address
Shunt
Voltage
Shunt
Current
Description of Status
1
2
3
4
5
6
7
8
OFF OFF OFF
NA
Address 8#
OFF OFF ON
Address 1# (Setting for SM-DU in 1st Supp. Bay)
OFF ON OFF
Address 2# (Setting for SM-DU in 2nd Supp. Bay)
OFF ON ON
Address 3# (Setting for SM-DU in 3rd Supp. Bay)
ON OFF OFF
Address 4# (Setting for SM-DU in 4th Supp. Bay)
ON OFF ON
Address 5# (Setting for SM-DU in 5th Supp. Bay)
ON ON OFF
Address 6#
ON ON ON
Address 7#
NA
OFF OFF
NA
Shunt Voltage: 75mV
OFF ON
Shunt Voltage: 25mV (Note 1)
ON OFF
Shunt Voltage: 50mV
ON ON
Shunt Voltage: 60mV
NA
OFF OFF OFF
Shunt Current: 500A (Note 1)
OFF OFF ON
Shunt Current: 100A
OFF ON OFF
Shunt Current: 200A
OFF ON ON
Shunt Current: 300A
ON OFF OFF
Shunt Current: 400A
ON OFF ON
Shunt Current: 1000A
ON ON OFF
Shunt Current: 1500A
ON ON ON
Shunt Current: 2000A
Note 1: Setting for this system.