2. Place the UPS on the support bases and support base extensions, as shown in Figure 2-
5
.
Vertiv
Support base
UPS
Figure 2-5 UPS Installation complete
2.5.2
Rack Installation
Installation procedures for UPS
1. Use eight M4 × 10 screws to fix two brackets (accessories) respectively on both sides of
the UPS front panel, as shown in Figure 2-
6
.
Ve
rtiv
UPS
Bracket (2pcs)
Screw (8pcs)
Figure 2-6 Installing brackets
It is prohibited to move the UPS through the brackets.