background image

Mechanical Installation

Vertiv

| Liebert

®

 EXM

 Parallel Cabinet User Manual  |

9

1.6.1

Power Cable Connection Procedure

The system input, UPS bypass, UPS output and system output cables (all require lug type 
terminations) are connected to power blocks behind the power isolator switches as shown in 

2.0 - Installation Drawings

. These are accessible when the side or top panel is removed.

Equipment Ground

The equipment ground busbar is near the input and output power supply connections as shown 
in 

2.0 - Installation Drawings

. The grounding conductor must be connected to the ground 

busbar.
All cabinets and cable trunking should be grounded in accordance with local regulations.

Once the equipment has been finally positioned and secured, connect the power cables as 
described in the following procedure.
Refer to the appropriate cable connection drawing in 

2.0 - Installation Drawings

.

1.

Verify that the equipment is isolated from its external power source and all the power isolators are open. 
Check that these supplies are electrically isolated and post any necessary warning signs to prevent their 
inadvertent operation.

2.

Remove the panels.

!

WARNING

Risk of electric shock. Can cause equipment damage, injury and death.
Failure to follow adequate grounding procedures can result in electric shock hazard to 
personnel and the risk of fire, should a ground fault occur.

!

AVERTISSEMENT

Risque de décharge électrique pouvant entraîner des dommages matériels, des blessures 
et même la mort.
Le non-respect des procédures de mise à la terre peut entraîner des risques 
d’électrocution du personnel, ou des risques d’incendie en cas de défectuosité de la mise à 
la terre.

!

WARNING

Risk of electric shock. Can cause equipment damage, injury and death.
The operations described in this section must be performed by authorized electricians or 
properly trained and qualified technical personnel wearing adequate safety clothing, eye 
protection and gloves.
If you have any difficulties, do not hesitate to contact Vertiv. See the back page of this 
manual for contact information.

!

AVERTISSEMENT

Risque de décharge électrique pouvant entraîner des dommages matériels, des blessures 
et même la mort.
Toutes les opérations décrites dans cette section ne doivent être effectuées que par des 
électriciens ou des techniciens professionnels dûment formés et qualifiés portant gants, 
lunettes et vêtements de protection adéquats.
En cas de problème, n’hésitez pas à communiquer avec Vertiv. Pour obtenir les 
renseignements de contact, consultez la dernière page de ce manuel.

NOTE

Proper grounding considerably reduces problems in systems caused by electromagnetic 
interference.

Summary of Contents for EXM Parallel Cabinet

Page 1: ...Liebert EXM Parallel Cabinet User Manual 10 200kVA 60Hz ...

Page 2: ...or damages resulting from use of this information or for any errors or omissions Refer to other local practices or building codes as applicable for the correct methods tools and materials to be used in performing procedures not specifically described in this document The products covered by this instruction manual are manufactured and or sold by Vertiv This document is the property of Vertiv and c...

Page 3: ...ert EXM Parallel Cabinet 14 Figure 5 Main components 600mm 2 1 Liebert EXM Parallel Cabinet 15 Figure 6 Main components 800mm 2 1 Liebert EXM Parallel Cabinet 16 Figure 7 Main components 800mm 1 1 and 2 0 Liebert EXM Parallel Cabinet 17 Figure 8 Outline drawing 300mm Liebert EXM Parallel Cabinet 18 Figure 9 Outline drawing 600mm Liebert EXM Parallel Cabinet 19 Figure 10 Outline drawing 800mm Liebe...

Page 4: ...llel Cabinet with SKRU inter lock11 Table 4 Liebert EXM Parallel Cabinet specifications 27 Table 5 Liebert EXM Parallel Cabinet output currents 1 1 configuration 28 Table 6 Liebert EXM Parallel Cabinet output currents 2 0 and 2 1 configurations 28 Table 7 Recommended lug sizes compression type M10 3 8 bolt 29 Table 8 Busbar torque for power wiring 29 Table 9 Terminal block torque with compression ...

Page 5: ...heck for voltage with both AC and DC voltmeters prior to making contact AVERTISSEMENT Le centre de gravité élevé des appareils présente un risque de renversement lors des déplacements pouvant entraîner des dommages matériels des blessures et même la mort Faites preuve d une extrême prudence lors de la manutention des armoires afin d éviter de les endommager ou de blesser le personnel Les armoires ...

Page 6: ...ocedures This equipment contains circuits that are energized with high voltage Only test equipment designed for troubleshooting should be used This is particularly true for oscilloscopes Always check with an AC and DC voltmeter to ensure safety before making contact or using tools Even when the power is turned Off dangerously high potential electric charges may exist All power and control wiring s...

Page 7: ...e dépannage doivent être utilisés Cette mise en garde couvre notamment les oscilloscopes Utilisez toujours un voltmètre c a et c c pour vérifier les tensions avant d établir un contact ou d utiliser des appareils Des tensions dangereusement élevées peuvent demeurer dans le système même une fois l alimentation coupée Tous les câbles d alimentation et de contrôle doivent être installés par un électr...

Page 8: ...ny damage to the shipper immediately Verify that the correct equipment is being installed The equipment supplied has an identification tag on the back of the main door reporting the type size and main calibration parameters of the UPS Verify that the room satisfies the environmental conditions stipulated in the equipment specifications paying particular attention to the ambient temperature and air...

Page 9: ... are secured to the chassis by screws The side panel can be removed for access to the power connections bars auxiliary terminal blocks and power isolators 1 4 1 Moving the Cabinets The route to be travelled between the point of arrival and the unit s position must be planned to make sure that all passages are wide enough for the unit and that floors are capable of supporting its weight for instanc...

Page 10: ...m the bottom or top WARNING Risk of moving heavy units and tipping hazard Can cause equipment damage injury and death Exercise extreme care when handling cabinets to avoid equipment damage or injury to personnel The Liebert EXM Parallel Cabinet s weight ranges from 263 to 714 lb 119 3 to 323 8kg Locate center of gravity symbols and determine unit weight before handling each cabinet Test lift and b...

Page 11: ...onlinear loads The grounding conductor should be sized according to local or NEC codes cable lengths type of protection etc The grounding cable connecting the UPS to the main ground system must follow the most direct route possible Consider using smaller paralleled cables for heavy currents as a way of easing installation WARNING Risk of electric shock Can cause equipment damage injury and death B...

Page 12: ... Figure 1 Cabinet arrangement Liebert EXM UPS battery cabinets Liebert Parallel Cabinet Liebert EXM Liebert EXM Liebert EXM Parallel Cabinet Matching Battery Cabinet Matching Liebert EXM Battery Cabinet Matching Battery Cabinet Matching Parallel Cabinet Matching Liebert EXM ...

Page 13: ... to follow adequate grounding procedures can result in electric shock hazard to personnel and the risk of fire should a ground fault occur AVERTISSEMENT Risque de décharge électrique pouvant entraîner des dommages matériels des blessures et même la mort Le non respect des procédures de mise à la terre peut entraîner des risques d électrocution du personnel ou des risques d incendie en cas de défec...

Page 14: ...be in accordance with local and national codes of practice NOTE Care must be taken when routing power cables Ensure that the cables do not touch other busbars Table 1 Power wiring for Liebert EXM UPS to Liebert EXM Parallel Cabinet System Configuration From To Liebert EXM 10 20kVA 2 0 Liebert EXM 10 40kVA 1 1 Utility UPS 1 AC Input Utility UPS 2 AC Input Utility TB4 UPS 1 AC Output TB1 UPS 2 AC Ou...

Page 15: ...ty UPS 2 AC Input Utility UPS 3 AC Input UPS 1 AC Output MOB1 UPS 2 AC Output MOB2 UPS 3 AC Output MOB3 Parallel Cabinet Output Critical Load Liebert EXM 120 200kVA 1 1 Liebert EXM 120 160kVA 2 0 Utility UPS 1 AC Input Utility UPS 2 AC Input Utility MBB UPS 1 AC Output MOB1 UPS 2 AC Output MOB2 Parallel Cabinet Output Critical Load Liebert EXM 120 160kVA 2 1 Utility UPS 1 AC Input Utility UPS 2 AC...

Page 16: ...M UPS to Liebert EXM Parallel Cabinet System Configuration From Liebert EXM UPS Bypass Module TB1 2 1 1 1 and 2 0 UPS 1 X9J26 9 TB1 8 X9J26 11 TB1 7 X9J26 13 TB1 1 X9J26 15 TB1 2 UPS2 X9J26 9 TB1 10 X9J26 11 TB1 9 X9J26 13 TB1 3 X9J26 15 TB1 4 2 1 UPS3 X9J26 9 TB1 12 X9J26 11 TB1 11 X9J26 13 TB1 5 X9J26 15 TB1 6 ...

Page 17: ...n ground system must follow the most direct route possible Consideration should be given to the use of smaller paralleled cables for heavy currents as a way to ease installation In most installations the load is connected to a distribution network of individually protected busbars fed by the Liebert EXM Parallel Cabinet output rather than being connected directly to the Liebert EXM Parallel Cabine...

Page 18: ...les must be run in separate conduits 5 Control wiring must be run in separate conduits 6 Customer must supply shunt trip breaker with 120V coil 7 2 0 available only from 10 160 kVA 180 and 200 kVA are 1 1 only UPS 1 AC Input 4 Wire Grd See Note 6 Field Supplied Wiring External Overcurrent Protection By Others LEGEND MOB Module Output Breaker MIB Maintenance Isolation Breaker MBB Maintenance Bypass...

Page 19: ...e conduits 5 Control wiring must be run in separate conduits 6 Customer must supply shunt trip breaker with 120V coil UPS 1 AC Input 4 Wire Grd See Note 6 Field Supplied Wiring External Overcurrent Protection By Others LEGEND MOB Module Output Breaker MIB Maintenance Isolation Breaker MBB Maintenance Bypass Breaker UPS 2 AC Input 4 Wire Grd See Note 6 UPS 3 AC Input 4 Wire Grd See Note 6 Liebert E...

Page 20: ...cal codes 4 If maintenance bypass cabinet is attached to UPS Vertiv will supply the interconnection cables MOB1 MOB2 MIB MBB 67 8 1721mm 12 305mm 7 5 191mm 1 8 46mm 0 65 17mm 0 65 17mm Ø 0 56 14mm 14 Places 2 8 71mm 2 2 56mm 8 Places 0 79 20mm 0 79 20mm 1 75 44mm 3 Places 1 75 44mm 2 1 53mm 1 6 41mm 1 3 33mm 6 Places Ø 0 44 11mm 8 Places 0 59 15mm 1 3 33mm 2 7 69mm 1 38 35mm Ø 0 38 9 7mm 9 Places ...

Page 21: ...be in accordance with national and local electrical codes 3 If maintenance bypass cabinet is attached to UPS Vertiv will supply the interconnection cables Output Busbars See Detail A MOB1 MOB3 MOB2 MIB MBB 67 1702mm 19 4 493mm 2 8 71mm 1 7 43mm 8 Typically 1 75 44mm 1 75 44mm 8 Typically EXM16017 Rev 1 DETAIL A Phase Busbar Connections FRONT VIEW Door Removed LEFT SIDE VIEW Panel Removed Ground Bu...

Page 22: ...Control wiring and power wiring must be run in separate conduits 3 All wiring is to be in accordance with national and local electrical codes 4 If maintenance bypass cabinet is attached to UPS Vertiv will supply the interconnection cables 5 2 1 available only from 120 160 kVA 62 9 1598mm 58 6 1488mm 20 5 521mm MBB MOB2 MOB3 Bypass Input Busbar See DETAIL A 1 65 42mm 0 55 14mm 0 56 14mm 1 75 44mm D...

Page 23: ...Bypass Input Busbar See DETAIL A Neutral Busbar See DETAIL B Ground Busbar See DETAIL D 0 61 15mm 1 75 44mm SIDE VIEW With Panel Removed FRONT VIEW With Door Removed ISOMETRIC VIEW DETAIL B DETAIL A DETAIL C DETAIL D 1 69 43mm Typically NOTES 1 All dimensions are in inches mm 2 Control wiring and power wiring must be run in separate conduits 3 All wiring is to be in accordance with national and lo...

Page 24: ...e access plates Remove punch to suit conduit size and replace 5 Unit bottom is structurally adequate for forklift handling 6 Control wiring and power wiring must be run in separate conduits 7 Copper cables only are recommended 8 All wiring is to be in accordance with national and local electrical codes FRONT DETAIL A TOP VIEW BOTTOM VIEW RIGHT SIDE VIEW FRONT VIEW EXM12010A Rev 3 Leveler Cable Ent...

Page 25: ...ly adequate for forklift handling 5 Control wiring and power wiring must be run in separate conduits 6 Copper cables only are recommended 7 All wiring is to be in accordance with national and local electrical codes BOTTOM VIEW TOP VIEW RIGHT SIDE VIEW DETAIL A FRONT VIEW Cable Entry Area 20 7 x 17 7 526mm x 450mm Control Cable Entry 5 9 x 2 150mm x 51mm Control Cable Entry 4 7 x 1 6 119mm x 41mm C...

Page 26: ...mm X 16 8 427mm Power Cable Plate 28 3 719mm X 17 5 445mm Control Cable Entry 5 9 x 2 0 150mm x 51mm 2 9 74mm NOTES 1 All dimensions are in inches mm 2 24 610 minimum clearance above unit for air exhaust 36 914 front access required for service 3 Keep cabinet within 15 degrees of vertical 4 Top and bottom cable entry is available through removable access plates Remove punch to suit conduit size an...

Page 27: ...nly 100 400 200 601 X2 AC Output AC Output Fuse Fuse FH1 FH1 Option FH2 Option FH2 0 N 0 A 0 B 0 C 0 N 0 A 0 B 0 C MFP_O MFP_S MFP_C Main_abnl_O Main_abnl_S Main_abnl_C X9J24 1 3 5 2 4 6 MFP_O MFP_S MFP_C Main_abnl_O Main_abnl_S Main_abnl_C X9J24 1 3 5 2 4 6 X9J26 GND_Dry GND_Dry Q5_Status Q3_Status 15 13 11 9 X9J26 GND_Dry GND_Dry Q5_Status Q3_Status 15 13 11 9 X9J23 BFP_O BFP_S BFP_C INV_O INV_S...

Page 28: ...ain_abnl_O Main_abnl_S Main_abnl_C MFP_O MFP_S MFP_C Main_abnl_O Main_abnl_S Main_abnl_C X9J26 X9J26 X9J26 X9J24 X4 X9J24 X9J24 C B A PE FH1 FH1 FH1 FH2 FH2 Option Option Option FH2 mN C B A PE mN C B A Phase B Phase C MBB MIB TB1 MOB1 MOB2 MOB3 Phase A C N O N C 14 11 10 9 12 13 GND_Dry GND_Dry Q5_Status Q3_Status GND_Dry GND_Dry Q5_Status Q3_Status 15 13 11 9 15 13 11 9 GND_Dry GND_Dry Q5_Status...

Page 29: ...2 UPS 1 UPS Fuse Fuse PE mN C B A PE mN C B A X9J26 GND_Dry GND_Dry Q5_Status Q3_Status 15 13 11 9 X9J26 GND_Dry GND_Dry Q5_Status Q3_Status 15 13 11 9 FH1 FH1 FH2 Option FH2 Option FH2 Option 0 N 0 N 0 A 0 A 0 B 0 B 0 C 0 C EPO NC 12V 12V EPO NO 1 2 3 4 EPO NC 12V 12V EPO NO 1 2 3 4 J2 J2 4 WHT 6 BLK 4 WHT 3 WHT 1 WHT 6 BLK 4 BLK 2 BLK 51 52 53 54 55 56 57 58 TB7 TB5 MBB MOB1 MOB2 Customer Neutra...

Page 30: ...atus 15 13 11 9 X9J26 GND_Dry GND_Dry Q5_Status Q3_Status 15 13 11 9 X9J26 GND_Dry GND_Dry Q5_Status Q3_Status 15 13 11 9 X9J23 BFP_O BFP_S BFP_C INV_O INV_S INV_C 1 3 5 2 4 6 X9J23 BFP_O BFP_S BFP_C INV_O INV_S INV_C 1 3 5 2 4 6 X9J23 BFP_O BFP_S BFP_C INV_O INV_S INV_C 1 3 5 2 4 6 EPO NC 12V 12V EPO NO 1 2 3 4 J2 EPO NC 12V 12V EPO NO 1 2 3 4 J2 EPO NC 12V 12V EPO NO 1 2 3 4 J2 4 WHT 4 WHT 6 BLK...

Page 31: ...5 2 4 6 X9J23 BFP_O BFP_S BFP_C INV_O INV_S INV_C 1 3 5 2 4 6 X9J23 BFP_O BFP_S BFP_C INV_O INV_S INV_C 1 3 5 2 4 6 PE mN C B A PE mN C B A PE mN C B A AC Input AC Input AC Input EPO NC 12V 12V EPO NO 1 2 3 4 J2 EPO NC 12V 12V EPO NO 1 2 3 4 J2 EPO NC 12V 12V EPO NO 1 2 3 4 J2 AC Output Fuse FH1 Option FH2 0 N 0 A 0 B 0 C AC Output Fuse FH1 Option FH2 0 N 0 A 0 B 0 C MOB2 MOB1 MOB3 AUX AUX C N O N...

Page 32: ...mN C B A PE mN C B A AC Input AC Input X9J26 GND_Dry GND_Dry Q5_Status Q3_Status 15 13 11 9 X9J26 GND_Dry GND_Dry Q5_Status Q3_Status 15 13 11 9 X9J23 BFP_O BFP_S BFP_C INV_O INV_S INV_C 1 3 5 2 4 6 X9J23 BFP_O BFP_S BFP_C INV_O INV_S INV_C 1 3 5 2 4 6 EPO NC 12V 12V EPO NO 1 2 3 4 J2 EPO NC 12V 12V EPO NO 1 2 3 4 J2 62 63 64 65 66 67 102 101 99 61 Neutral Phase C Phase B Phase A Customer Neutral ...

Page 33: ...th side panels attached 11 81 300 23 62 600 31 49 800 Depth in mm 39 4 1000 Height in mm 78 74 2000 Weight lb kg 1 1 2 0 263 119 3 1 1 2 0 594 269 4 2 1 594 269 4 1 1 2 0 686 311 2 2 1 714 323 8 Color Black ZP 7021 Degree of Protection for UPS Enclosure IP 20 with and without front door open Standards and conformities UL1778 5th Edition CSA 22 2 107 3 14 ISTA Procedure 1H WEEE Minimum Clearance To...

Page 34: ...00 kcmil 120 333 450 M12 620 2 350 kcmil 2 500 kcmil 140 389 500 M12 620 2 350 kcmil 2 500 kcmil 160 444 600 M12 760 2 500 kcmil 180 500 700 M12 930 3 350 kcmil 3 500 kcmil 200 555 700 M12 930 3 350 kcmil 3 500 kcmil Table 6 Liebert EXM Parallel Cabinet output currents 2 0 and 2 1 configurations 2 0 and 2 1 Configuration UPS Size in Parallel System Rating Nominal Output Current OCP Device Rating B...

Page 35: ... 256 030695 733 2AWG 54143 60118 54811BE 1AWG 54148 60124 54857BE 1 0AWG 54109 60130 256 30695 593 2 0AWG 54110 60136 54862BE 60238 3 0AWG 54111 60142 54864BE 60244 4 0AWG 54112 60148 54866BE 60250 250kcmil 54174 60154 54868BE 60256 300kcmil 54179 60160 54870BE 60262 350kcmil 256 30695 112 54872BE 60267 400kcmil 256 30695 1403 54874BE 60269 500kcmil 256 30695 339 54876BE 60273 Table 8 Busbar torqu...

Page 36: ...Specifications Vertiv Liebert EXM Parallel Cabinet User Manual 32 ...

Page 37: ......

Page 38: ...ames and logos referred to are trade names trademarks or registered trademarks of their respective owners While every precaution has been taken to ensure accuracy and completeness herein Vertiv Co assumes no responsibility and disclaims all liability for damages resulting from use of this information or for any errors or omissions Specifications are subject to change without notice SL 25654_REV5_8...

Reviews: