Vertiv™ NetSure™ 512
NGBB
-48 VDC Power System User Manual
Proprietary and Confidential © 2022 Vertiv Group Corp.
39
Restarting the Power System
1.
Reconnect the AC and DC power sources to the power system.
2.
Start the power system. Refer to the separate
Installation Instructions
(IM582137000) for a startup procedure.
3.
Verify no alarms are active.
Figure 4.9
Replacing a Distribution Panel in a List 7 Distribution Cabinet
Battery Disconnect
Device Busbar Hardware
Alarm Wiring
In-Line Connector
Rear
System Load
Distribution Device
Busbar Hardware
Sub-System Load
Distribution Device
Busbar Hardware
Distribution Panel
Hardware
Distribution Panel
Hardware
Front
Components removed in
illustration for clarity only.