Vertiv™ NetSure™ IPE Series -48 VDC Outdoor Rectifier Installation and User Manual
Proprietary and Confidential © 2022 Vertiv Group Corp.
55
3.9
Wire Preparation
Figure 3.3 Strip insulation off the wires for RELAY OUTPUT and COMM as required (This is for PG Gland Wiring version
only.)
8-Conductor Cable: 24 AWG to 26 AWG leads, 4 PR DO’s (Recommended Shielded Twisted Pair (STP) Cable)
2-Conductor Cable: Battery-Rectifier RS-485 Communication, 24 AWG or 26 AWG leads, Shielded Twisted Pair (STP)
2-Conductor Cable: Rectifier to Customer Equipment Communication, RS-485 Northbound, 24 AWG or 26 AWG leads,
Shielded Twisted Pair (STP) Cable / DI only used for MCB alarm detection under parallel mode.