Versare Solutions, LLC
3236 California St. NE • Minneapolis, MN 55418
1-855-457-1473 • [email protected]
Coutertop Shield
Assembly Instructions
Loosely attach 2 Screws and 2 Square Nuts by hand through
the side holes of the
fi
rst foot. The square nuts should be
positioned on the inside angle of the feet.
Align the foot with the post of the side frame and insert,
matching the square nuts with the exterior channel.
Position the foot assembly so the
buttonhead of the two screws are on
the outside of the Countertop Shield
and slightly tighten each screw with
the included allen wrench, do not fully
tighten.
Repeat the above steps for the second foot assembly.
Tools and hardware included:
1.
2.
3.
4.
Once the second foot has been attached, set the Countertop Shield upright.
Con
fi
rm that the Shield is standing straight and perpendicular, adjust as needed
to achieve, then
fi
nish tightening all four screws.*
5.