background image

 
 

Rental Center Guide 

Operating Steps and Safety Practices 

Vermeer RTX130 & RTX200 Trenchers 

For 

Safety Videos

 

and other resources, 

go to 

Support/Safety

 

on 

www.vermeer.com

 

Visit Vermeer at 

www.vermeer.com

  to locate your local Vermeer dealer. 

 

 

 

05/2017                                                                       Your machine may have product improvements and features not yet contained in this guide.                             Part Number 105400EP7    Edition 1.00 

Vermeer Corporation reserves the right to make changes at any time without notice or obligation. 

© 2017 Vermeer Corporation. All Rights Reserved. 

1210 Vermeer Rd. East, Pella, IA 50219 USA 

 

       

Your 

rental associate

 or technician 

will explain

 each of the following 

operating steps and safety practices before you use

 this trencher. 

 

WARNING:  

Do not use or attempt to operate the machine until you understand proper operation and safety of the 

machine. Read the Operator’s Manual.  Read safety signs attached to the machine.  If you are unsure of content 
or meaning of the safety messages or information regarding machine operation, ask your rental associate or 
technician for more details. 

 

INTENDED USE:

  Vermeer RTX130 and RTX200 Trenchers are designed solely to produce an open trench in a continuous operation with 

rearward motion of the machine.  Backfill blades (if equipped) are designed to be used solely to push earthen material, typically to return excavated 
material back into the trench. 

OPERATING STEPS 

1. Engine Start: 

a. 

Check all machine fluid levels and condition of air cleaner before starting machine. 

b. 

Place “

Propel

” and “

Digging Chain Drive

” levers in NEUTRAL. 

c. 

Fully close “

Choke”

 (cold engine only).  NOTE: Open “

Fuel Shutoff Valve” 

if necessary. Move “

Throttle”

 to 1/4 speed. 

d. 

Push “

Off/On Switch”

 to ON position (recoil start) or turn “

Key Switch”

 to ON position (electric start). 

e. 

Pull “

Rope

” (recoil start) or turn “

Key Switch

” to START position (electric start) to start engine and let it warm up. 

f. 

After engine starts, gradually open “

Choke”

 and reduce 

“Throttle

” to idle. 

2. Highway Transport: 

a. 

Before transporting machine on a trailer, read trailer manual for safety precautions and loading information.  Ensure gross weight of machine with 
attachments is within the gross weight limits of the trailer and the towing vehicle.  Approximate weight without boom or chain:  

RTX130:

    880 lb (400 kg) with tires, 1140 lb (517 kg) with tracks;                    

RTX200:

     910 lb (413 kg) with tires, 1170 lb (531 kg) with tracks. 

b. 

Clean machine to keep any debris off highway.  Fully raise trencher boom, position machine in-line with trailer ramps, set 

“Throttle”

 to half speed.  

From level ground, drive machine squarely onto trailer and stop machine when tie-down position is reached. Avoid loading if ramps are slippery.

 

c. 

Place “

Propel

” lever in NEUTRAL, shut off engine, remove key (electric start) and turn off fuel valve (if equipped) to prevent engine flooding.

 

d. 

Secure machine to trailer using

 

standard tie-down procedures with one front and two rear tie-down points.

 

e. 

Reverse procedure for unloading machine from trailer.  Ensure trailer is on level ground.  Avoid unloading if ramps are slippery.

 

3. Setup: 

a. 

Contact the local One-Call system in your area to request location of all underground utilities near work area. 

b. 

Operating the machine will require you to wear protective equipment.  Always wear a hard hat, safety shoes, hearing protectors, and eye 
protection.  If working near traffic, wear reflective clothing. 

c. 

Examine work area for any obstructions, conditions, or situations which may impair machine operation or create a safety hazard for the operator 
or other persons.  Look for evidence or notices of underground placements, manhole covers, drop boxes, and recent trenching activity.  All 
utilities in these areas should be marked and avoided. Check for and stay away from steep slopes, banks, overhangs, drop-offs, and trenches 
which can cave in.  Use the information on safety signs on the machine and in the Operator’s Manual combined with your own good judgment 
when identifying operating hazards and avoidance measures. 

d. 

Either the trench cleaner assembly or restraint bar

 

must be in place on the trencher boom while digging.  These are intended to help protect 

against accidental personal contact with the digging chain. 

4. Driving the Machine:

 

a. 

Disengage digging chain and fully raise boom when driving while not digging a trench.  Never ride on machine.

 

b. 

Pull up red “

Operator Presence Lever”

 on left handlebar.

 

c. 

Use “

Propel Lever”

 to begin moving machine slowly. Use a speed suitable for the terrain.

 

d. 

Pivot handlebars to steer, rotating rear of machine in direction of push. Machine will counter-rotate if “

Propel Lever”

 is in NEUTRAL.

 

5. Opening a Trench: 

a. 

Line up machine at beginning of trench. 

b. 

If equipped with trench cleaner, follow 

Shutdown Procedure 

to shut off engine. Then raise and secure trench cleaner. 

c. 

Follow Starting Procedure, pull up on red “

Operator Presence Lever”

 and move “

Throttle”

 to FULL RPM. 

d. 

With 

“Digging Chain Drive”

 engaged in FORWARD, lower trencher boom slowly to the desired digging depth.  

NOTICE:

 Lowering boom too 

quickly will result in excessive boom and machine bounce. A small amount of rearward ground travel during the plunge cut may help in reducing 
boom and machine bounce.  Trencher will 

STOP

 anytime the 

“Operator Presence Lever”

 is released. 

e. 

If using trench cleaner, stop digging chain after plunge cut, raise trencher boom until chain is out of ground and shut off machine.  Release 
trench cleaner, restart machine, engage digging chain in FORWARD, and lower trencher boom to desired digging depth. 

f. 

Adjust rearward ground travel speed for the best productivity when the required trench depth has been reached. 

g. 

Use handlebar steering controls to maintain trenching direction.

 

6. 

Restarting Stalled Machine:

 

a. 

If digging chain snags material and stalls engine, place 

“Propel” 

and 

“Digging Chain Drive” 

levers in NEUTRAL and restart engine.  Slightly raise 

trencher boom and reverse digging chain to free obstruction. 

b. 

Engage 

“Digging Chain Drive”

 in FORWARD, lower trencher boom to desired digging depth and resume trenching. 

7. Shutdown Procedure: 

a. 

Place 

“Propel

” and 

“Digging Chain Drive”

 levers in NEUTRAL.  Reduce engine speed to IDLE, push “

Off/On Switch”

 to OFF position (recoil start) 

or turn “

Key Switch”

 to OFF position and remove key (electric start). Close “

Fuel Shutoff Valve

” if equipped. 

 

Operator’s Manual and Rental Center Guide are available in other languages. Contact [email protected].  Se dispone del Manual del 
Operador y de la guía de centros de alquiler en otros idiomas. Póngase en contacto con [email protected]

 

See other side for Safety Practices 

 

 

Reviews: