![Vermeer McLaughlin V25 Operator And Maintenance Manual Download Page 87](http://html1.mh-extra.com/html/vermeer/mclaughlin-v25/mclaughlin-v25_operator-and-maintenance-manual_1005433087.webp)
V25/VX30G/VSK25/VSK30G Vacuum Excavators
Operating the Vacuum Excavator 50-5
These instructions assume that all of the preparation procedures have been followed. Refer to
Operating Precautions
•
Verify that spoil tank rear door
is shut, locked, and properly sealed.
•
Open Upper Gate/Inlet valve
(1)
to vent tank before starting engine. Close valve
after engine has started.
•
Ensure Lower Gate/Dump valve is closed.
•
High pressure water can cut utility lines. Test water pressure on a sample of the
material to be located.
•
Do not direct pressurized water at overhead lines. Water conducts electricity.
•
Before opening rear door, open inlet valve to vent tank. Keep hands and fingers clear
when closing the door.
•
Engine speed is preset at the factory. This speed should not be changed. Damage to
engine or pump may result.
NOTICE:
Failure to follow these instructions will result in reduced performance of the vacuum excavator.
WARNING:
Do not operate unit where flammable gas is present.
1
Summary of Contents for McLaughlin V25
Page 8: ...This page intentionally left blank...
Page 26: ...This page intentionally left blank...
Page 28: ...This page intentionally left blank...
Page 44: ...This page intentionally left blank...
Page 50: ...This page intentionally left blank...
Page 82: ...This page intentionally left blank...
Page 122: ...This page intentionally left blank...
Page 124: ...This page intentionally left blank...
Page 136: ...This page intentionally left blank...
Page 140: ...This page intentionally left blank...
Page 144: ...This page intentionally left blank...
Page 152: ...This page intentionally left blank...
Page 156: ...This page intentionally left blank...
Page 168: ...This page intentionally left blank...
Page 176: ...This page intentionally left blank...