D20x22 Series II Navigator HDD
Overview 30-7
Engine Shutdown Test
Perform Remote Lockout Test before drilling each day.
The Remote Lockout system is equipped to operate as either a hydraulic lockout (default) or an
engine shutdown system. Refer to “Hydraulic Lockout or Engine Shutdown Option,”
Step 1:
Start machine and remain in operator’s seat.
Step 2:
Press and hold black
Power On/Off
Button
(1)
for 2 seconds.
Step 3:
Press and hold green
Run
Button
(3)
for 2 seconds. Green light will illuminate.
Machine is now in Drill mode.
Step 4:
Test thrust and rotation controls. They should work.
Step 5:
Press and release red
Lockout
Button
(2)
. Red light will illuminate and engine will shut down.
Machine is now in Lockout mode.
Engine must shut down.
If engine does not shut down, contact
your Vermeer dealer immediately.
After successful Lockout test, press and hold the green button
(3)
for 2 seconds to return to Drill mode.
2
1
3