STAGEMAKER®
-
43
VERLINDE reserves the right to alter or amend the above information without notice.
11/2008
2-fall chain :
•
Insert the last link in the small plastic hook of the insertion tool.
•
Insert the other side of the tool in the sprocket, chain bucket side.
•
Raise the chain at slow speed so that the tool and the chain come out the other side of the
sprocket. Continue until about 50 cm of chain are visible.
•
Put the chain through the idler sprocket, taking care not to twist the chain
•
Carefully remove the chain anchor (5) removing the 4 screws. Take out the pin (6).
•
Insert the end of the chain into the hole of the chain anchor.
•
Insert the pin (6) into the hole of the chain anchor.
•
Insert the chain anchor and tighten the 4 screws (torque 20 Nm).
11.4.3 Measuring the wear on the chain
This should be done by measuring the dimensions, at several points of the chain, of one link (d) and
(t), and over 11 links (11 t).
Maximum wear allowed :
Minimum link thickness allowed (d) :
4.30 mm
Maximum pitch allowed (t) :
13.10 mm
Maximum length allowed (11 t) :
140.25 mm
)
If these limits are exceeded
, the chain must be replaced immediately
. In this case, the wear
on the guide chain and chain sprocket should also be checked and they should be replaced if
necessary.
)
If a single link is defective in any way whatsoever,
the chain must be replaced
,
A repetitive stop and start at the same point of the chain will create a more important
wear on the 2-3 links which are in the chain sprocket
Never twist the lifting chains
(turning around of the hook block)
11.5 Suspension hook
Removal :
•
Remove the screw and the locking plate.
•
Remove the two pins.Take the hook out.
Replacement :
•
Put the hook into its housing.
•
Place the two pins inside the hook
•
Fit the screw and the locking plate without forgetting the safety washer.