background image

TM

CURRENT MONITORING

INSTALLATION GUIDE

Z201504-0C 

PAGE 1 

©2012 Veris Industries   USA 800.354.8556 or +1.503.598.4564  / [email protected]  

01122

Alta Labs, Enercept, Enspector, Hawkeye, Trustat, Veris, and the Veris ‘V’ logo are trademarks or registered trademarks of  Veris Industries, L.L.C. in the USA and/or other countries.

Split-Core Current Switch, High Voltage Output, 

with Command Relay

HAZARD OF ELECTRIC SHOCK, EXPLOSION, OR ARC FLASH

•  Follow safe electrical work practices. 

See NFPA 70E in the USA, or applicable local codes.

•  This equipment must only be installed and serviced by qualified electrical personnel.
•  Read, understand and follow the instructions before installing this product.
•  Turn off all power supplying equipment before working on or inside the equipment.
•  Use a properly rated voltage sensing device to confirm power is off.
  DO NOT DEPEND ON THIS PRODUCT FOR VOLTAGE INDICATION
•  Only install this product on insulated conductors.

Failure to follow these instructions will result in death or serious injury.

DANGER

H959

TM

959

NOTICE

•  This product is not intended for life or safety applications.

•  Do not install this product in hazardous or classified locations.

•  The installer is responsible for conformance to all applicable codes.

•  Mount this product inside a suitable fire and electrical enclosure.

Installer’s Specifications

Sensor Power 

 Induced from monitored conductor

Insulation Class 

 600VAC RMS

Frequency Range  

50/60Hz

Temperature Range 

 -15° to 60°C (5° to 140°F)

Humidity Range 

10-90% RH, non-condensing

Hysteresis  

 10% Typical

Terminal Block Maximum Wire Size 

14 AWG

Terminal Block Torque (nominal) 

4 in-lbs (0.45 N-m)

Safety 

UL508 open device listing

Do not use the LED status indicators as evidence of applied voltage.

WIRING EXAMPLE

DIMENSIONS

Removable Mounting Bracket

Self-gripping 

Iris

1.0”

(25 mm)

0.8”

(21 mm)

1.1”

(26 mm)

3.1”

(79 mm)

2.8”

(70 mm)

Ø = 0.3”

(8 mm)

1.4” 

(36 mm)

2.5”

(64 mm)

3.0”

(76 mm)

Bracket can be mounted 
on three sides for added 
installation flexibility.

Use DIN Rail 

Mounting clip 

(Veris part 

number AH01) to 

mount on stan-

dard DIN rail.

INSTALLATION

Disconnect and lock out power to the enclosure containing the 

conductor to be monitored.

1.  Locate a mounting surface for the removable mounting bracket that will allow 

the monitored conductor to pass through the center window when it is installed 
and that will keep the device at least 1/2” from any uninsulated conductors. 
Determine cable routing for the controller connection, allowing wiring to reach 
the mounting location.

2.  Install mounting bracket to the chosen surface using the included screws.

3.  Wire the output connections between the sensor and the controller.

4.  Snap the sensor over the conductor to be monitored and clip the assembly to the 

mounting bracket.

5.  Secure enclosure and reconnect power

6.  Calibrate the sensor (see Calibration section).

Fan or Pump

CONTROLLER

Motor

CONTACTOR

DI 

(Status)

DO 

(Relay

          Coil)

CONTROL

POWER

www.

GlobalTestSupply

.com

Find Quality Products Online at:

[email protected]

Reviews: