Siting and Setting Up
Use the manual handling method recommended by your health and
safety officer to place the product on a level, stable surface that is not
prone to vibration or movement. The surface upon which the product is
placed must be of a height suitable to allow the operator to easily and
safely use the equipment.
Ensure that the power supply or isolating switch is easily accessible to
the operator.
l
The surface on which the equipment is mounted should be stable and not subject to
movement or vibrations.
l
The height of the mounting surface is important to avoid operator strain when load-
ing and unloading samples.
Note:
Adequate space must be provided to accommodate the CSR with the guard
open.
Under no circumstances should any objects be placed on top of the
product.