4.7.2.4
Analysis Grids
The analysis grids are an integral part of the automatic analysis program and must be
set up before the test is started if the 'Auto Analysis' option is selected, see section
4.7.3.4 where automatic analysis is to be carried out after the furnace has finished its
test cycle. The grids must be adjusted so that they are central to the test piece and that
they completely cover the sample and its proposed deformation area.
Click the 'Analysis Grids' button to open this window.
Each test piece can be assigned a grid which is to be
overlaid over the test piece. The size and position of the
grid can be set here.
Note
: Right mouse clicking anywhere in the display window
will activate this box. Adjustment of the grids can be made
at any time prior to the analysis of the test pieces.
Identity
- this is the identity of the grid on the screen. The grid identified will be
highlighted in red and the grid identity number is shown on the top left corner of the
grid. When highlighted an individual grid can be adjusted.
Note
: The number of grids is controlled in the 'Test Piece Identification' screen, see
section 4.7.2.3.
Grid: Rows and Columns
- This changes the number of columns and rows of the
selected grid.
Grid: Size (Pixels)
- This changes the global pixel size of the individual grids. This has
no dimensional relationship.
Grid: Position X and Y
. The grid position on the screen can be specified. Grids can
also be positioned by using click and drag.
Grid Display
- Selecting the check box will display or hide the grids on the screen.
Select all Grids
- With this box selected all the grids shown on the screen can be
adjusted at the same time, except for the grid position.
33
Summary of Contents for CARBOLITE GERO CAF G5
Page 63: ...Fig 3 Front Tube Seal Assembly Fig 4 Door Arm Assembly 63 ...
Page 64: ...Fig 5a Camera Mounting Bracket Fig 5b Lens and Camera Assembly 64 ...
Page 65: ...Fig 5c Sliding the Camera Mounting Bracket Assembly onto the Door Arm 65 ...
Page 66: ...Fig 5d Securing the Camera Mounting Bracket Assembly to the Door Arm 66 ...
Page 67: ...Fig 5e Mounting the Lens and Camera Assembly 67 ...
Page 68: ...Fig 5f Lens and Camera Assembly in Position 68 ...
Page 69: ...Fig 6a Rear View of the Standard CAF G5 Furnace Showing Brick Box Assembly 69 ...
Page 71: ...Fig 7 Front Tube Seal Position 71 ...
Page 72: ...Fig 8 Tube End Seal Assembly Tightening Sequence Fig 9 Work Tube Front Support 72 ...
Page 73: ...Fig 10 Fitting the Door Arm Assembly Fig 10a Adjusting the Door Arm Assembly 73 ...
Page 74: ...Fig 11a Furnace Case and Controls 74 ...
Page 75: ...Fig 11b Gas Inlet Pipe Fig 12 Positioning the Furnace 75 ...
Page 77: ...Fig 13c Loading Samples into the Work Tube 77 ...
Page 78: ...Fig 16 File Folder 78 ...
Page 79: ...Fig 17 Door Arm Assembly Exploded View 79 ...
Page 82: ...SST DT HT FT Fig 18 Report Sheet Page 2 Side View Plan View Fig 19 Formed Wire Sample 82 ...
Page 83: ...Fig 20 Sample Carrier Sample Tiles and Sample Positions 83 ...
Page 84: ...Fig 21a Coal and Coke Test Piece Mould Fig 21b Biomass Test Piece Mould and Hand Press 84 ...
Page 85: ...Fig 22 Sample Loading Tool Fig 23 Camera Ethernet Connection 85 ...
Page 86: ...Fig 24 LED Driver Connection 86 ...
Page 87: ...Notes Service Record Engineer Name Date Record of Work ...