![VERDER CARBOLITE GERO ABF 8/28 Installation, Operation And Maintenance Instructions Download Page 7](http://html.mh-extra.com/html/verder/carbolite-gero-abf-8-28/carbolite-gero-abf-8-28_installation-operation-and-maintenance-instructions_1003626007.webp)
3.0
Installation
3.1
Unpacking & Handling
When unpacking or moving the product, always lift by its base; do not use the door or
any other projecting cover or component to support the equipment when moving it. Use
a fork lift or pallet truck to move the product; position the product on a level surface
and use an adequate number of personnel to safely move the product into position.
Carefully remove any packing material from inside and around the product before use.
Avoid damaging the surrounding insulation when removing packing materials.
NOTE: This product contains Refractory Ceramic Fibre (also known as
Alumino Silicate Wool - ASW). For precautions and advice on handling
this material see section 9.2.
3.2
Siting and Setting Up
Place the product on a level surface in a well ventilated area.
Site away from other sources of heat and on a non-flammable surface that is resistant
to accidental spillage or hot materials.
The surface on which the equipment is mounted should be stable and not subject to
movement or vibrations.
The height of the mounting surface is important to avoid operator strain when loading
and unloading samples.
Unless otherwise stated elsewhere in this manual, ensure that there is
at least 150
mm
of free space around the back and sides of the product. Clear space is required
above the product to dissipate heat.
7
3.0 Installation
Summary of Contents for CARBOLITE GERO ABF 8/28
Page 11: ...Fig 14 Schematic for Mains Electrical Connections 11 3 0 Installation ...
Page 21: ...4 6 Navigation Diagram 21 4 0 2416 Controller ...
Page 33: ...5 7 Navigation Diagram 33 5 0 Afterburner 2132 Controller ...
Page 40: ...7 0 Operation Photo 3 5 40 ...
Page 53: ...Notes Service Record Engineer Name Date Record of Work ...