
ROBOT HP7E / HP10E / HP12E / HP15E / HP20E
8. Maintenance
8-20
© VEMAG 2010
8.10 Biennial maintenance
8.10.1 Double screw drive (oil change)
The oil in the double screw drive should be changed every two years.
• Open the service hatch on the right-hand side.
• Unscrew the cover (1) of the expansion reservoir, holding the reservoir
steady in the other hand, and take it out of its bracket. You must hold
the reservoir upright so that no oil escapes. The connecting hose to
the double screw drive is long enough to enable filling to take place
outside the machine housing.
• Drain the used oil into a suitable container.
• Then fill the expansion reservoir with fresh oil and attach the expan-
sion reservoir back in its bracket after replenishing it. Check the filling
level. The oil should come at least to the marking on the reservoir.
• Check whether oil is present in coiled relief hose for the seals of the
double screw drive shafts. If this should be the case, the seals in the
double screw drive must be replaced, otherwise there is a risk of oil
getting into the double screws.
1 Cover
Fig. 8-21
Changing double screw
drive oil
1
• Close the service hatch again.
Warning!
Inform VEMAG Customer Service immediately if there is oil in the relief
hose. The seals of the double screw drive must be replaced before pro-
duction is resumed.
Summary of Contents for 160.0215
Page 8: ......
Page 10: ...ROBOT HP7E HP10E HP12E HP15E HP20E 0 Foreword 0 2 VEMAG 2010...
Page 22: ...ROBOT HP7E HP10E HP12E HP15E HP20E 2 Description 2 8 VEMAG 2010...
Page 32: ...ROBOT HP7E HP10E HP12E HP15E HP20E 3 Installation and commissioning 3 10 VEMAG 2010...
Page 58: ...ROBOT HP7E HP10E HP12E HP15E HP20E 6 Graphical control 6 12 VEMAG 2010 USB stick plugged in...
Page 60: ...ROBOT HP7E HP10E HP12E HP15E HP20E 6 Graphical control 6 14 VEMAG 2010 Mode group Mode View...
Page 64: ...ROBOT HP7E HP10E HP12E HP15E HP20E 6 Graphical control 6 18 VEMAG 2010...
Page 66: ...ROBOT HP7E HP10E HP12E HP15E HP20E 6 Graphical control 6 20 VEMAG 2010...
Page 68: ...ROBOT HP7E HP10E HP12E HP15E HP20E 6 Graphical control 6 22 VEMAG 2010...
Page 100: ...ROBOT HP7E HP10E HP12E HP15E HP20E 6 Graphical control 6 54 VEMAG 2010...
Page 102: ...ROBOT HP7E HP10E HP12E HP15E HP20E 6 Graphical control 6 56 VEMAG 2010...
Page 112: ...ROBOT HP7E HP10E HP12E HP15E HP20E 6 Graphical control 6 66 VEMAG 2010...
Page 128: ...ROBOT HP7E HP10E HP12E HP15E HP20E 7 Cleaning 7 16 VEMAG 2010...
Page 164: ...ROBOT HP7E HP10E HP12E HP15E HP20E 10 Appendix 10 12 VEMAG 2010 10 8 Hydraulic plan...
Page 168: ...ROBOT HP7E HP10E HP12E HP15E HP20E 10 Appendix 10 16 VEMAG 2010...