GLT-299-7-2(3) Rev.0 

Jun 12, 2018 

Instruction Manual 

VDOT-H2/VDOT-H2-H

 

Analog Heat Detector

 

 

Before Installation 

Please read these instructions carefully and keep for future reference. 

The information in this document is subject to change without notice. For updates please refer to our website.

 

 

Do not use the products outside the rated power supply voltage range specified in 
the Specifications. It may cause a fire or damage to equipment.

  !   CAUTION  

 

Do not disassemble, repair, or modify the products. It may cause a fire or electric 
shock.

  !   CAUTION  

 

Make sure to turn the power off before commencing any wiring work. Otherwise it 
may cause electric shock or damage to equipment.

  !   CAUTION  

 

 

Note: 

Follow the requirements for the installation of the products in accordance with the Specifications. Otherwise it 

may cause malfunction. 

Note:

 Do not install the product in any location where oil, dust, iron powder, chemicals, or hydrogen sulphide may 

occur or affect the product. It may cause damage to equipment. 

 

Section 1 

– INTRODUCTION 

1.1 

General description

 

The 

VDOT-H2

 and 

VDOT-H2-H

 is an attractively-styled, low profile, analog addressable, heat detector for use with 

the Velocity MMP Control Panel series in analog fire alarm systems. 

This analog addressable heat detector has a specific detector address to provide exact detector locations throughout 

the installation. This allows for constant monitoring of the detector sensitivity and reports the detector

’s condition to the 

fire alarm control panel. 

The 

VDOT-H2

 is a 8.3 °C (15 °F) rate-of-rise temperature heat detector with 57 °C (135 °F) fixed temperature alarm. 

The 

VDOT-H2-H

 is a high temperature heat detector with 83 °C (181 °F) fixed temperature alarm.

 

1.2 

LED Indicator

 

LED Indicators for 360° visibility (OMNIVIEW

TM

 360°) of VDOT-H2 and VDOT-H2-H operate as follows: 

Green LED flashes in normal operation. 

Red LED illuminates and Green LED flashes in an alarm condition.

 

ZETA ALARMS LIMITED 

72-78 MORFA ROAD, SWANSEA, SA1 2EN 

 http://www.velocitydetection.com 

 

Summary of Contents for VDOT-H2

Page 1: ...der chemicals or hydrogen sulphide may occur or affect the product It may cause damage to equipment Section 1 INTRODUCTION 1 1 General description The VDOT H2 and VDOT H2 H is an attractively styled l...

Page 2: ...es an alarm in response to both 8 3 C 15 F rate of rise temperature or a 57 C 135 F fixed temperature alarm point The VDOT H2 H initiates an alarm in response to 83 C 181 F Heat detector incorporates...

Page 3: ...RMINALS The VDOT H2 and VDOT H2 H heat detectors all have three terminal connections and the terminals are configured as follows Terminal Description 1 SLC Positive 6 SLC Negative 3 To activate VDOT S...

Page 4: ...VDOT UB4 Standard mounting base GLT 299 7 6 4 inch 4 X X VDOT UB4 6 Larger mounting base GLT 299 7 7 6 inch 4 X X VDOT S6 Base Sounder mounting base GLT 299 7 10 6 inch 5 X VDOT STB RL Relay mounting...

Page 5: ...the detector at least 10 cm 4 in from the wall The detector should not be installed in places such as Place with plenty of air flow close to a ventilation fan air conditioner or place with drafts Pla...

Page 6: ...nted as a square Actual detector coverage covers a circle whose radius is 0 7 times the listed spacing Since all of the area within the detector s circle of coverage is suitable for detecting a fire t...

Page 7: ...A A A B B B B C C C C D D D D Listed Spacing 9 1m x 9 1m 84m2 30ft x 30ft 900ft2 A 7 6m x 10 4m 79m2 25ft x 34ft 850ft2 B 6 1m x 11 3m 69m2 20ft x 37ft 740ft2 C 4 6m x 11 9m 54m2 15ft x 39ft 585ft2 D...

Page 8: ...table here Ceiling Sidewall Note Measurements shown are to the closest edge of the detector Figure 5 Detector placement near ceiling or wall joints The following figure shows the required heat detecto...

Page 9: ...84 4 3 to 4 9 m 14 to 16 ft 77 4 9 to 5 5 m 16 to 18 ft 71 5 5 to 6 0 m 18 to 20 ft 64 6 0 to 6 7 m 20 to 22 ft 58 6 7 to 7 3 m 22 to 24 ft 52 7 3 to 7 9 m 24 to 26 ft 46 7 9 to 8 5 m 26 to 28 ft 40 8...

Page 10: ...4 m 8 ft on center If beams are greater than 46 cm 18 in in depth and are spaced more than 2 4m 8 ft on center then each bay formed by the beams must have at least one detector mounted on the ceiling...

Page 11: ...iew Notes Detectors can be installed on the bottom of beams when the beams are less than 30 cm 12 in deep and beam spacing is less than 2 4 m 8 ft Beams less than 20 cm 8 in deep are considered flat c...

Page 12: ...end of the ceiling Additional detectors if required must be located based on the horizontal projection of the ceiling and the type of ceiling construction For a ceiling slope of less than 30 degrees...

Page 13: ...re 14 2 Using the VDOT AD2 Address Programmer set the desired address for each heat detector See Annex A for the handling 3 Install the heat detector into the mounting base making sure the wiring does...

Page 14: ...o each loop Use cable AWG12 20 for wiring Do not connect different gauge cables at one terminal in order to prevent loosening CAUTION Do not connect cables in reverse polarity Failure to connect the p...

Page 15: ...nsors must be tested after installation and periodically thereafter Testing methods must satisfy the Authority Having Jurisdiction AHJ When carrying out site testing of the detector the control panel...

Page 16: ...nue as long as the outer ring makes contact with the ceiling b Hold the Heat Detector Tester over the detector until the detector alarms 7 Remove the Heat Detector Tester from the detector to stop tes...

Page 17: ...tric shock CAUTION 1 Carefully remove the detector head from its base 2 Use a soft lint free cloth moistened with alcohol for sticky deposits to clean the plastic enclosure 3 Using a soft bristle brus...

Page 18: ...del VDOT H2 0 C to 65 6 C 32 F to 150 F Model VDOT H2 H Operating Temperature 10 C to 55 C 14 F to 131 F Model VDOT H2 10 C to 65 6 C 14 F to 150 F Model VDOT H2 H Storage Temperature 20 C to 60 C 4 F...

Page 19: ...stion or b at the Zeta s option repayment of the price where this had been paid And the warranty period is three 3 years from the shipment from Zeta s factory 12 3 Notwithstanding anything to the cont...

Page 20: ...place Figure A 1 Mounting a detector on VDOT AD2 3 Press the Search Key a Buzzer sounds then the VDOT AD2 starts transmitting to the detector b Do not remove the detector when transmitting or damage c...

Page 21: ...new address 2 Press the Set key a The buzzer sounds and all LED s are turned off The VDOT AD2 then starts transmitting to the detector b Do not remove the detector 3 The 7 segment LED shows the new ad...