FIGURE 13.3: CONDENSATE TRAP EXPLODED PARTS VIEW
t.
Replace any wiring
which has been disconnected.
u.
Inspect the hydronic system
. Look for leaks and repair any found. If system contains antifreeze, or other additives,
test and/or maintain them as directed by the additive manufacturer. See Part XI (Start-up and Checkout) for
important information on boiler water and the use of boiler water additives.
v.
Test the flow switch
. To do this:
•
Start with the boiler in standby.
•
Close a shut-off valve in the boiler loop.
• Initiate a call for heat and confirm that the boiler shows Hold 137 indicating that the flow switch is open.
w.
Follow ALL instructions in Part XI (Start-up and Checkout)
to place the boiler back in service, including the
performance of a combustion test.
CAUTION
If burner comes on with no flow through the boiler, there is a problem with the flow switch. Turn the
boiler off immediately. Failure to do so could cause severe heat exchanger damage.
Summary of Contents for Shadow Series
Page 10: ...9 Figure 5 1 Wall Layout Mounting Hole Location...
Page 11: ...10 Figure 5 2 Boiler Mounting Bracket Installation Boiler Wall Mounting...
Page 17: ...16 FIGURE 7 4 WALL PENETRATION CLEARANCES FOR PVC VENT PIPE...
Page 34: ...33 FIGURE 7 24 INSTALLATION OF IPEX AND DIVERSITECH CONCENTRIC TERMINAL THROUGH ROOF...
Page 41: ...40 FIGURE 9 2 NEAR BOILER PIPING HEATING ONLY BOILER LOOP PIPING SHOWN SHADED...
Page 42: ...41 FIGURE 9 3a NEAR BOILER PIPING HEATING PLUS INDIRECT WATER HEATER...
Page 43: ...42 FIGURE 9 3b NEAR BOILER PIPING HEATING PLUS INDIRECT WATER HEATER...
Page 47: ...46 This page is intentionally left blank...
Page 50: ...49 FIGURE 10 2 LINE VOLTAGE FIELD CONNECTIONS FIGURE 10 3 LOW VOLTAGE PCB TERMINAL CONNECTIONS...
Page 52: ...51 FIGURE 10 4a 120V LWCO FIELD WIRING FIGURE 10 4b 24V LWCO FIELD WIRING...
Page 54: ...53 FIGURE 10 6 INTERNAL WIRING CONNECTIONS DIAGRAM...
Page 55: ...54...
Page 62: ...61 Lighting and Operating Instructions...
Page 82: ...81 FIGURE 14 6 CONTROLS LOCATION FIGURE 14 7 PRESSURE SWITCH TUBING CONNECTIONS...
Page 87: ...86 Blower Gas Valve Assembly for 150 180...
Page 90: ...89...
Page 103: ...102...