26
Table 7.15: Summary of Split Vent System Options
Option #
25
26
Illustrated in Figure
7.14
7.14
Pipe Penetration Through
Structure
Vent
Roof
Roof
Intake
Wall
Wall
Material
Vent
CPVC/PVC
(Note 2)
CPVC/PVC
(Note 2)
Intake
PVC
PVC
Nominal Diameter
Vent
2”
3” (Note 3)
Intake
2” or 3”
3” (Note 3)
Min Equivalent Vent Length:
Models
080
48”
48”
100
48”
48”
120
Not Permitted
48”
150
52”
180
52”
Max Equivalent Vent Length (Note 1):
Models
080
60ft
135ft
100
60ft
135ft
120
Not Permitted
135ft
150
135ft
180
135ft
Rigid Vent Terminals
Vent
Coupling w
Screen
Coupling w
Screen
Intake
90 Elbow w
Screen
90 Elbow w
Screen
1) Max vent lengths shown also apply to the intake.
2) First 30” plus first exhaust elbow are CPVC.
3) For models 80 and 100: Make increase in vent diameter from 2 to 3” at boiler collar (before first elbow). Reduce intake diameter
from 3” to 2” at intake collar.
All vertical terminals require compatible roof flashing and storm collars
.
Summary of Contents for Shadow Series
Page 10: ...9 Figure 5 1 Wall Layout Mounting Hole Location...
Page 11: ...10 Figure 5 2 Boiler Mounting Bracket Installation Boiler Wall Mounting...
Page 17: ...16 FIGURE 7 4 WALL PENETRATION CLEARANCES FOR PVC VENT PIPE...
Page 34: ...33 FIGURE 7 24 INSTALLATION OF IPEX AND DIVERSITECH CONCENTRIC TERMINAL THROUGH ROOF...
Page 41: ...40 FIGURE 9 2 NEAR BOILER PIPING HEATING ONLY BOILER LOOP PIPING SHOWN SHADED...
Page 42: ...41 FIGURE 9 3a NEAR BOILER PIPING HEATING PLUS INDIRECT WATER HEATER...
Page 43: ...42 FIGURE 9 3b NEAR BOILER PIPING HEATING PLUS INDIRECT WATER HEATER...
Page 47: ...46 This page is intentionally left blank...
Page 50: ...49 FIGURE 10 2 LINE VOLTAGE FIELD CONNECTIONS FIGURE 10 3 LOW VOLTAGE PCB TERMINAL CONNECTIONS...
Page 52: ...51 FIGURE 10 4a 120V LWCO FIELD WIRING FIGURE 10 4b 24V LWCO FIELD WIRING...
Page 54: ...53 FIGURE 10 6 INTERNAL WIRING CONNECTIONS DIAGRAM...
Page 55: ...54...
Page 62: ...61 Lighting and Operating Instructions...
Page 82: ...81 FIGURE 14 6 CONTROLS LOCATION FIGURE 14 7 PRESSURE SWITCH TUBING CONNECTIONS...
Page 87: ...86 Blower Gas Valve Assembly for 150 180...
Page 90: ...89...
Page 103: ...102...