Throughput Summary Gateway List - Level 4
17.4.1.6 Starting/Stopping a Throughput (Multiple Streams) Test
Once all configurations have been made, tap the
Start
button on the right section of the screen to start the measurements.
If testing on the fiber ports, make sure the LASER is turned On before starting the test.
End-to-End Testing
Connect the test set to another unit that supports eCPRI testing.
After configuring test settings on both units, start the tests.
17.4.2 Throughput Results
When the test is first started, the screen changes to the Global/Aggregate results screen automatically.
17.4.2.1 Global/Aggregate Results
The Global results pages display measurements for all traffic streams as well as non test traffic.
The
Global Stream Summary
screen displays:
Stream number (#)
Transmit and Receiver rate (bps)
Events (errors/alarms) associated with the stream
Throughput Results - Global Stream Summary
RXT-6200_RXT6000e_Module_Manual
Page 365 of 387
Summary of Contents for RXT-6000e
Page 1: ......
Page 39: ...Rx Pattern Setup Go back to top Go back to TOC RXT 6200_RXT6000e_Module_Manual Page 39 of 387...
Page 48: ...Tx Interface Setup Tx Structure Setup Text Mode RXT 6200_RXT6000e_Module_Manual Page 48 of 387...
Page 61: ...RXT 6200_RXT6000e_Module_Manual Page 61 of 387...
Page 97: ...RXT 6200_RXT6000e_Module_Manual Page 97 of 387...
Page 199: ...RXT 6200_RXT6000e_Module_Manual Page 199 of 387...
Page 267: ...Event Log Go back to top Go back to TOC RXT 6200_RXT6000e_Module_Manual Page 267 of 387...
Page 327: ...Go back to top Go back to TOC RXT 6200_RXT6000e_Module_Manual Page 327 of 387...
Page 351: ...Go back to top Go back to TOC RXT 6200_RXT6000e_Module_Manual Page 351 of 387...