Installation
Installing the Pump
18
Separation of Zone 0 and Zone 1 is accomplished by the male connector partition wall
between the packer and manifold connection. Connection of the UMP wiring is within
the Zone 0 boundary and Increased Safety measures inside the flameproof enclosure
must be ensured during field wiring connections.
13. Connect like colored wires from the UMP to like colored wires to the male connector with supplied Thomas &
Betts #T&B RBB217 butt splice connectors and making a mechanical crimp.
14. Pull on each wire to verify a reliable crimp was achieved.
15. Insulate the three connections by placing each by itself into an epoxy sealant bag following steps A, B, C
below.
16. When finished sealing the wires, coil the wires inside the packer's wiring compartment as neatly as possible
(see Figure 13). For clarity, the epoxy packs are shown transparent.
17. Lubricate the O-ring on the packer wiring compartment cover (with lifting eyebolt) with petroleum based jelly.
Screw in the packer wiring compartment cover (thread sealant should not be used). Torque to 35 ft-lbs (50
N•m).
Confirm that the lifting eyebolt is properly torqued to 10 ft-lbs (13.6 N•m) with a mini-
mum of 6 full threads installed. Occasionally, eyebolts are removed after pump instal-
lation and corrosion may occur in the threaded areas of the wiring compartment cover
(eyebolt plug) and the eyebolt. If corrosion has occurred, the cover and eyebolt should
be replaced.
18. Utilize the lifting eyebolt to suspend the pump vertically and then install the pump onto the riser pipe using UL
classified for petroleum, non-setting thread sealant until watertight and align appropriately to connect to the
product line piping.
When servicing equipment, use non-sparking tools and use caution when removing or
installing equipment to avoid generating a spark.
WARNING
To m
a
le
connector
Tie wr
a
p
B
u
tt
s
plice
From pigt
a
il
A
C
B
Wire in
su
l
a
tion i
s
f
u
lly into epoxy
Only one
connection
per
ba
g.
In
s
tr
u
ction
s
:
NOTE: When temper
a
t
u
re i
s
b
elow 50°F (10°C), keep
re
s
in in
a
w
a
rm pl
a
ce prior to mixing (e.g., in
a
n
in
s
ide pocket next to
b
ody).
1. Open epoxy
s
e
a
l
a
nt p
a
ck
a
ge,
a
nd remove re
s
in p
a
k.
2. Holding re
s
in p
a
k
as
s
hown in A,
b
end p
a
k
a
long
long length.
3
. A
s
s
hown in B, firmly
squ
eeze the RED
S
IDE of the
re
s
in, forcing it thro
u
gh the center
s
e
a
l
a
nd into
BLACK
S
IDE.
4. Mix thoro
u
ghly to
a
u
niform color
b
y
squ
eezing
content
s
ba
ck
a
nd forth 25-
3
0 time
s
.
5.
Squ
eeze mixed, w
a
rm re
s
in into one end of
ba
g
a
nd
c
u
toff other end.
6.
S
lowly in
s
ert wiring connection into
s
e
a
ling p
a
ck
u
ntil
it i
s
s
n
u
g
a
g
a
in
s
t the oppo
s
ite end
as
s
hown in C.
7. Twi
s
t open end of
ba
g
a
nd
us
e tie wr
a
p to clo
s
e it off
a
nd po
s
ition the tie wr
a
pped end
u
p
u
ntil the re
s
in
gel
s
.
WARNING