Vectra Fitness On-Line 1400 Owner'S Manual Download Page 6

6.

 In this step, you

will install the press arm
(E), along with the press
adjustment plate (F) to the machine.
(large 1/2” i.d. washer, Qty: 1, and 1/2-13 X 1 button head screws, Qty: 2).
Begin by placing the press adjustment plate onto the press arm such that
the latch pin is in one of the notches and the large hole is over the post on
the end of the press arm. Next place one of the bolts through the ball bearing
installed in the main column frame member (D). Thread the washer onto this
bolt. Now position the press arm assembly according to the diagram and
thread this bolt into the internally thread post mentioned above. Insert the
second bolt through the bearing at the top of the press post (B) and into the

press arm assembly. The press adjustment
plate should be supported in a “V” shaped
notch in the main column frame member.
Tighten the two bolts installed in this step
very tight with a 5/16” hex key. 

FIG. 3

member (C) to press post (B)  (3/8-16
X 1/2 hex screw, Qty: 4). To do this,
first route the cable exiting the side
of the press post (B) into the frame
member, down its length, around the
pulley (#11) and out. To do this it will
be necessary to temporarily remove
the pulley. Ensure that the pulley bolt

is very tight after reinstalling it. Leave the four bolts connecting the frame
member to the press post a little loose, until told to tighten them later in
these instructions. (Note: any pulley numbers mentioned in the text or shown
on these drawings correspond with the cable diagram on the other side of
this manual. Refer to that diagram as necessary during the assembly process
if you’d like another perspective.)

 FIG. 2

5.

  Now attach main column frame member (D) to press station frame

member (C) (3/8-16 X 1/2 hex screw, Qty: 3). 

FIG. 2

7.

  Now route the cable emerging from

the press station frame member (C) as
follows: first route it around one pulley
(#12) of the double moving pulley unit (G),
next it goes under pulley #13, over pulley
#14, and then down into the main column
frame member (D) and around pulley #15.
It needs to continue along the length of
this frame member and exit through the
large round hole in the bracket welded on
its end. Place the double moving pulley
unit (G) on the floor for now. 

FIG. 4

10.

  In preparation for

attaching the stack column (I)
to the two frame members,
place the guide rods inside.
First, place a rubber bumper
(located inside of the top plate
hardware box) around the end
of each guide rod at the end
that does not have the bolt. The
two guide rods now go into the
open back of the stack column
such that the end with the rubber
bumper ends up on a locator tube
at the base of the column.

IMPORTANT: 

The guide rods

need to be in stack column (I) now because ceiling height might make later
insertion difficult or impossible. Now assemble the stack column (I) to the
frame members (C & D). (3/8-16 X 1/2 hex screws, qty: 4) Because the stack
column needs to be held off the ground to align the holes, placing 3 or 4 layers
of scrap cardboard under the stack column on the floor will save time and
effort. At this stage you may tighten the stack column bolts and the bolts that
hold the two frame members to each other.

 FIG. 7

FR

ONT VIEW

BO

TT

OM VIEW

LEFT

Flipper

Flipper

1" Washer

Cotter pin

RIGHT

1" Washer
Cotter pin

J

L

K

M

11.

 Now install right butterfly arm (J) (arm closest to stack column) on

its vertical pivot bar. The right arm is the one with the spring mounted flipper
and related assembly at the lowest point on the arm. The right cam (K) is the
cam with the bushing supported by the shortest connector. Slip the cam over
the assembly that holds the spring mounted flipper, such that the flipper
engages the notches on the underside of the cam and such that the bushings
all line up. Now slide the two items as one up the pivot shaft. Install 1”
washer and then cotter pin, bend end. Repeat this process for the left arm
(L) and cam (M). Test the ratcheting system at this point. If any problems are
suspected, look up into the ratcheting mechanism from below. If the spring
mounted flipper is not in the notched section, take the cam and arm off the
pivot and after getting the flipper in the right area, reinstall the cam and arm
as an assembly.

 FIG. 8

FIG. 3

FIG. 4

E

G

5

12

13

14

15

11

C

D

F

I

D

C

FIG. 7

FIG. 8

Washer

E

F

D

B

I

D

C

16

20

18

Summary of Contents for On-Line 1400

Page 1: ...Owner s Manual On Line 1 400...

Page 2: ...only as much as you can control safely Never use dumbbells or other means to incrementally increase the weight resistance Use only those means provided by Vectra Don t be careless stay alert 12 Serio...

Page 3: ...ugh the pulleys beginning with the lowest number and working up For example if you are installing an entire set of cables start at pulley 1 If you are installing only a new low pulley cable PN 59940 f...

Page 4: ...product or any component part shipping delivery handling and administrative charges for returning parts to Vectra all necessary or incidental costs related to installation of the replacement part Clai...

Page 5: ...ter the instructions say to do so All bolts should be tight at the end of assembly 8 Now assemble the main column H to the main column frame member D 3 8 16 X 1 2 hex screw Qty 2 Before standing the m...

Page 6: ...g the length of this frame member and exit through the large round hole in the bracket welded on its end Place the double moving pulley unit G on the floor for now FIG 4 10 In preparation for attachin...

Page 7: ...tation pad mounting screws firmly FIG 10 20 Now that all the cable ends are attached the cable system may be completed behind the stack column Route the cable from the stack over the pulley 4 on the s...

Page 8: ...ver is operated in either direction the pin should retract fully allowing the press handle to rotate When the lever is released the pin should lock the press handle by snapping all the way into the ne...

Reviews: