background image

"Microbox"

DC Models

MBOX 200/2DC 

MBOX 200/2DCH

Continuous Mechanical Extract Ventilation

    Unit with Low Energy DC Motor - for 

    domestic and commercial use

Installation, Operating and Maintenance 

      Instructions

Page 5

8

9

7

6

5

4

CLEANING AND MAINTENANCE

1.    Before carrying out any maintenance or cleaning operations the mains electrical supply MUST be 

       disconnected

.

2.    CLEANING AND MAINTENANCE SHOULD BE CARRIED OUT BY A QUALIFIED PERSON

3.    Before attempting to remove the motor impeller assembly disconnect the cable by removing the

       terminal block inside the control box.

4.    Loosen the screws (Fig.8) without taking them off.

5.    Rotate slightly and remove the motor-impeller assembly (Fig. 8).

6.    Clean the motor-impeller assembly either with a dry brush or a dry cloth.

7.    Electrical parts 

cannot

be cleaned.

8.    Reassemble in the reverse order to above (Fig 9).

Page 6

WIRING and COMMISSIONING DIAGRAMS

Vectaire Ltd, Lincoln Road, Cressex Business Park, High Wycombe, Buckinghamshire, HP12 3RH

Tel: +44 (0)1494 522333.  Fax: +44 (0)1494 522337.  Email: [email protected]

MBOX200/2DC/160119

E & O.E

Standard

With Humidistat