"Microbox"
DC Models
MBOX 200/2DC
MBOX 200/2DCH
Continuous Mechanical Extract Ventilation
Unit with Low Energy DC Motor - for
domestic and commercial use
Installation, Operating and Maintenance
Instructions
Page 5
8
9
7
6
5
4
CLEANING AND MAINTENANCE
1. Before carrying out any maintenance or cleaning operations the mains electrical supply MUST be
disconnected
.
2. CLEANING AND MAINTENANCE SHOULD BE CARRIED OUT BY A QUALIFIED PERSON
3. Before attempting to remove the motor impeller assembly disconnect the cable by removing the
terminal block inside the control box.
4. Loosen the screws (Fig.8) without taking them off.
5. Rotate slightly and remove the motor-impeller assembly (Fig. 8).
6. Clean the motor-impeller assembly either with a dry brush or a dry cloth.
7. Electrical parts
cannot
be cleaned.
8. Reassemble in the reverse order to above (Fig 9).
Page 6
WIRING and COMMISSIONING DIAGRAMS
Vectaire Ltd, Lincoln Road, Cressex Business Park, High Wycombe, Buckinghamshire, HP12 3RH
Tel: +44 (0)1494 522333. Fax: +44 (0)1494 522337. Email: [email protected]
MBOX200/2DC/160119
E & O.E
Standard
With Humidistat