INSTALLATION
POWERING MACHINE
•
Connecting main power should be carried out by qualified electricians.
•
Observe all relevant regulations regarding cable sizing and insulation that apply
in the area in which the machine is being installed.
•
All load information can be obtained from the data plate located on the back side
of the machine.
•
The main cable can be routed either through the support column, as shown
below, or across the floor and beneath the machine depending on customer
preference.
o
The white column cap comes with a hole pre-drilled for a power cable.
o
Depending on the gage of the wire used, this hole may require enlargement.
•
The strain relief connector inside the machine must be properly tightened once
the main power has been connected.
o
This will insure a water tight seal around the cable where it enters the control
cabinet.
•
Be sure to replace the safety guards on the main disconnect switch after
completing the connections.
Summary of Contents for RS420
Page 6: ...SECTION 1 SAFETY...
Page 11: ...SECTION 2 TRANSPORTATION...
Page 13: ...SECTION 3 INSTALLATION...
Page 19: ...SECTION 4 INTERFACE TOUCH SCREEN...
Page 26: ...SECTION 5 MAINTENANCE INSPECTION SCHEDULE...
Page 39: ...SECTION 6 TROUBLESHOOTING GUIDE...
Page 55: ...SECTION 7 PNEUMATIC DIAGRAMS...
Page 73: ...SECTION 8 ELECTRICAL DIAGRAMS...
Page 91: ...SECTION 9 PARTS LIST ASSEMBLY DRAWINGS...
Page 148: ...Parts 8 12 Vacuum Valve O Ring Replacement Kit...
Page 149: ...SECTION 10 DIE ASSEMBLY DRAWINGS...
Page 156: ...NOTES...
Page 157: ...NOTES...