PaX-i
(PCH-2500) Installation Manual
78
4 Installing the Equipment: Floor Standing (Optional)
4.
Connect the OS power cable
H000927A
with
the cable from the connector
CN3
on the
power board.
5.
Arrange the cables and tie them with the
cable tie(Part No.10)
6.
Put the top cover back.
Removing the carrying handle (When the CEPH unit is installed)
1.
Move the equipment to the installation site
near the wall.
Two installers should hold the carrying
handle∙firmly∙while∙moving∙the∙equipment.
2.
Remove the carrying handle in the middle.
4.6 Removing the Protective Plastic Film
Remove the plastic film.
Summary of Contents for Pax-i PCH-2500
Page 1: ...Installation Manual Full version Model PCH 2500 Version 3 06 English...
Page 2: ......
Page 3: ......
Page 46: ...This page is intentionally left blank...
Page 82: ...This page is intentionally left blank...
Page 104: ...This page is intentionally left blank...
Page 124: ...This page is intentionally left blank...
Page 166: ...This page is intentionally left blank...
Page 167: ...Acquiring the Test Image 10...
Page 169: ...11 Technical Specifications...
Page 176: ...This page is intentionally left blank...
Page 179: ...PaX i PCH 2500 Installation Manual 179 Appendix Schematic diagram Components supplied...
Page 183: ...PaX i PCH 2500 Installation Manual 183 Appendix 2 3M 2 2M 2 1M 2 0M 4 Separate the side cover...
Page 199: ......
Page 200: ...Postal code 18449 13 Samsung 1 ro 1 gil Hwaseong si Gyeonggi do Korea www vatech co kr...